Visualization and Monitoring Algorithms for Multi-device Parallel Overhaul Progress at Substation Bases

This study proposes a dual verification monitoring method integrating BIM lightweight modeling and real-time matching of laser point clouds.Based on the construction drawings of the substation base,a BIM model of the equipment maintenance schedule plan within the substation base is constructed.The fault-tolerant BIM lightweight process of the QEM (Quadratic Error Measurement) algorithm and the triangulation folding method is adopted to perform lightweight conversion on the established BIM model to reduce the error after lightweight conversion.The experimental results show that under the application of this method, when the simplification rate is 55%, it can effectively achieve lightweight while ensuring the accuracy, completeness of the model and no information loss. It can accurately monitor the maintenance progress of different equipment in the substation, realize the visualization of multi-equipment parallel maintenance data, significantly increase the overall maintenance time, and verify the reliability of this method.

Authors

Publication Details

Journal
Eksploatacja i Niezawodnosc - Maintenance and Reliability
Published
2025-09-20
DOI
https://doi.org/10.17531/ein/208485
Primary Topic
Smart Grid and Power Systems
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Visualization and Monitoring Algorithms for Multi-device Parallel Overhaul Progress at Substation Bases

Fangfang Zhou, Yuping Yan, H. J. Lu, Zhongyue Cai
Eksploatacja i Niezawodnosc - Maintenance and Reliability
Smart Grid and Power Systems
article

Visualization and Monitoring Algorithms for Multi-device Parallel Overhaul Progress at Substation Bases

Fangfang Zhou, Yuping Yan, H. J. Lu, Zhongyue Cai
article en

Abstract

This study proposes a dual verification monitoring method integrating BIM lightweight modeling and real-time matching of laser point clouds.Based on the construction drawings of the substation base,a BIM model of the equipment maintenance schedule plan within the substation base is constructed.The fault-tolerant BIM lightweight process of the QEM (Quadratic Error Measurement) algorithm and the triangulation folding method is adopted to perform lightweight conversion on the established BIM model to reduce the error after lightweight conversion.The experimental results show that under the application of this method, when the simplification rate is 55%, it can effectively achieve lightweight while ensuring the accuracy, completeness of the model and no information loss. It can accurately monitor the maintenance progress of different equipment in the substation, realize the visualization of multi-equipment parallel maintenance data, significantly increase the overall maintenance time, and verify the reliability of this method.

Eksploatacja i Niezawodnosc - Maintenance and Reliability
Openalex Percentile: Top 75%
Smart Grid and Power Systems
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Visualization and Monitoring Algorithms for Multi-device Parallel Overhaul Progress at Substation Bases — Fangfang Zhou, Yuping Yan, et al. · Eksploatacja i Niezawodnosc - Maintenance and Reliability (2025) | TGRS Research Map | TGRS