Development and application of comprehensive evaluation system for the whole process of mining projects

Rapid economic growth has increased demand for mineral resources, accelerating the development of the mining industry. Mining companies often manage multiple projects simultaneously, facing challenges in performance, cost, and risk management. To address the lack of systematic evaluation frameworks in this domain, this paper establishes a comprehensive evaluation model for the entire process of mining projects. The comprehensive evaluation covers seven aspects: preliminary work, preparation for project implementation, project implementation management, settlement management, final investment cost, post-completion operation, and cost reduction and efficiency improvement. A total of 43 preliminary evaluation indicators were formulated, and the analytic hierarchy process (AHP) was integrated with the fuzzy comprehensive evaluation (FCE) method. The model was applied to an automated control project for a gold mine backfilling station, yielding a final evaluation score of 75.7 that closely aligned with on-site investigation findings, thereby assisting management in formulating and implementing subsequent decisions.

Authors

Institutions

Publication Details

Journal
International Journal of Mining and Mineral Engineering
Published
2025-01-01
DOI
https://doi.org/10.1504/ijmme.2025.148707
Primary Topic
Evaluation and Optimization Models
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Development and application of comprehensive evaluation system for the whole process of mining projects

Xiangwei Kong, Pengfei He, Yunsen Wang, Qiang Zou et al.
International Journal of Mining and Mineral Engineering
Evaluation and Optimization Models
article

Development and application of comprehensive evaluation system for the whole process of mining projects

Xiangwei Kong, Pengfei He, Yunsen Wang, Qiang Zou, Guiping Zheng
article en

Abstract

Rapid economic growth has increased demand for mineral resources, accelerating the development of the mining industry. Mining companies often manage multiple projects simultaneously, facing challenges in performance, cost, and risk management. To address the lack of systematic evaluation frameworks in this domain, this paper establishes a comprehensive evaluation model for the entire process of mining projects. The comprehensive evaluation covers seven aspects: preliminary work, preparation for project implementation, project implementation management, settlement management, final investment cost, post-completion operation, and cost reduction and efficiency improvement. A total of 43 preliminary evaluation indicators were formulated, and the analytic hierarchy process (AHP) was integrated with the fuzzy comprehensive evaluation (FCE) method. The model was applied to an automated control project for a gold mine backfilling station, yielding a final evaluation score of 75.7 that closely aligned with on-site investigation findings, thereby assisting management in formulating and implementing subsequent decisions.

International Journal of Mining and Mineral EngineeringVol. 16(3)
Newcrest Mining (Australia) (AU), Northeastern University (CN)
Openalex Percentile: Top 69%
Evaluation and Optimization Models
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Development and application of comprehensive evaluation system for the whole process of mining projects — Xiangwei Kong, Pengfei He, et al. · International Journal of Mining and Mineral Engineering (2025) | TGRS Research Map | TGRS