Analisis Perbandingan Rencana Anggaran Biaya Perhitungan Kontraktor dengan Metode Perhitungan AHSP 2025 pada Proyek Pembangunan BRI Unit Setu Bekasi

Indonesia is a developing country, and as such, many projects are underway or about to commence. In practice, there are often discrepancies between the budget prepared by the contractor and that prepared based on the AHSP 2025. This study aims to analyze the comparative Budget Plan (RAB) using two different approaches, namely the contractor's calculation method and the 2025 Work Unit Price Analysis (AHSP) method on the BRI Unit Setu Bekasi construction project. This study uses a descriptive-comparative quantitative approach, where all components of the structural work are analyzed in terms of unit prices of materials, labor wages, and tools based on both methods. The results show that the total budget cost based on the contractor's method is Rp. 1,995,455,880.00, while based on the 2025 AHSP method is Rp. 2,414,858,280.00. From these results, there is a difference of Rp. 419,402,400.00 or approximately 21%, where the contractor's method is lower in terms of total costs. This difference is caused by the flexibility of the contractor's method, which adjusts the unit price to field conditions and cost efficiency strategies, while the AHSP method is standard and administrative in nature according to the provisions of the Ministry of PUPR. This study contributes to choosing the most effective and efficient budget approach in construction projects. For the project implementers and owners, this comparison serves as an evaluative basis for preparing a realistic yet accountable budget.

Authors

Publication Details

Journal
Jurnal Teknik dan Science
Published
2025-09-20
DOI
https://doi.org/10.56127/jts.v4i3.2300
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analisis Perbandingan Rencana Anggaran Biaya Perhitungan Kontraktor dengan Metode Perhitungan AHSP 2025 pada Proyek Pembangunan BRI Unit Setu Bekasi

Era Agita Kabdiyono, Aditya Maulana
Jurnal Teknik dan Science
Management and Optimization Techniques
article

Analisis Perbandingan Rencana Anggaran Biaya Perhitungan Kontraktor dengan Metode Perhitungan AHSP 2025 pada Proyek Pembangunan BRI Unit Setu Bekasi

Era Agita Kabdiyono, Aditya Maulana
article en

Abstract

Indonesia is a developing country, and as such, many projects are underway or about to commence. In practice, there are often discrepancies between the budget prepared by the contractor and that prepared based on the AHSP 2025. This study aims to analyze the comparative Budget Plan (RAB) using two different approaches, namely the contractor's calculation method and the 2025 Work Unit Price Analysis (AHSP) method on the BRI Unit Setu Bekasi construction project. This study uses a descriptive-comparative quantitative approach, where all components of the structural work are analyzed in terms of unit prices of materials, labor wages, and tools based on both methods. The results show that the total budget cost based on the contractor's method is Rp. 1,995,455,880.00, while based on the 2025 AHSP method is Rp. 2,414,858,280.00. From these results, there is a difference of Rp. 419,402,400.00 or approximately 21%, where the contractor's method is lower in terms of total costs. This difference is caused by the flexibility of the contractor's method, which adjusts the unit price to field conditions and cost efficiency strategies, while the AHSP method is standard and administrative in nature according to the provisions of the Ministry of PUPR. This study contributes to choosing the most effective and efficient budget approach in construction projects. For the project implementers and owners, this comparison serves as an evaluative basis for preparing a realistic yet accountable budget.

Jurnal Teknik dan ScienceVol. 4(3)
Openalex Percentile: Top 62%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.