The Sibilike Optimized Project Cost Index (SOPCI)

Abstract Construction projects face enormous challenges due to cost overruns and delays arising from cost estimates which may be underestimated or lack of finances to finance the project elements in accordance with the work plans. This paper presents an index based on parameter optimization to determine the minimal and technically feasible solutions for project execution. The Sibilike Optimal Project Cost Index (SOPCI) is based on the contract clause that allows award of a project in whole or parts to prospective bidders. A number of methods have been developed for determination of Construction Cost Index (Mao and Xiao, 2024). The SOPCI is an innovative computation algorithm that combines the Technical Evaluation and Financial Evaluation in minimized deviation factor from the average value determined by considering the market rates and responsiveness of bidders. The optimized index determines the bidder who is both technically and financially competitive. It combines the technical evaluation and financial evaluation at the stage of project award. It thus gives the minimal cost for undertaking of an engineering project. The paper presents a step by step computation of SOPCI and presents comparative case studies based on real experience in project execution in Kenya. The SOPCI is useful to project planners and project managers in project evaluation and project award.

Authors

Publication Details

Journal
INTERANTIONAL JOURNAL OF SCIENTIFIC RESEARCH IN ENGINEERING AND MANAGEMENT
Published
2025-09-20
DOI
https://doi.org/10.55041/ijsrem52709
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

The Sibilike Optimized Project Cost Index (SOPCI)

Sibilike K . Makhanu
INTERANTIONAL JOURNAL OF SCIENTIFIC RESEARCH IN ENGINEERING AND MANAGEMENT
BIM and Construction Integration
article

The Sibilike Optimized Project Cost Index (SOPCI)

Sibilike K . Makhanu
article en

Abstract

Abstract Construction projects face enormous challenges due to cost overruns and delays arising from cost estimates which may be underestimated or lack of finances to finance the project elements in accordance with the work plans. This paper presents an index based on parameter optimization to determine the minimal and technically feasible solutions for project execution. The Sibilike Optimal Project Cost Index (SOPCI) is based on the contract clause that allows award of a project in whole or parts to prospective bidders. A number of methods have been developed for determination of Construction Cost Index (Mao and Xiao, 2024). The SOPCI is an innovative computation algorithm that combines the Technical Evaluation and Financial Evaluation in minimized deviation factor from the average value determined by considering the market rates and responsiveness of bidders. The optimized index determines the bidder who is both technically and financially competitive. It combines the technical evaluation and financial evaluation at the stage of project award. It thus gives the minimal cost for undertaking of an engineering project. The paper presents a step by step computation of SOPCI and presents comparative case studies based on real experience in project execution in Kenya. The SOPCI is useful to project planners and project managers in project evaluation and project award.

INTERANTIONAL JOURNAL OF SCIENTIFIC RESEARCH IN ENGINEERING AND MANAGEMENTVol. 09(09)
Openalex Percentile: Top 72%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.