Comparison of Project Duration Optimization for Speed Boat Production Using PERT and Critical Chain Project Management Methods (Case Study: CV. Rahman Jaya Abadi)

This study aims to determine which method yields the shortest project duration between the Program Evaluation and Review Technique (PERT) and Critical Chain Project Management (CCPM). The results indicate that CCPM produces a faster project completion time. With the addition of buffers, the project completion duration using CCPM is 28,5 days. In comparison, the shortest project duration with the PERT method requires 35 days with a success probability of 0,13%, while the longest duration is 45 days with a success probability of 99,87%.

Authors

Publication Details

Published
2025-09-19
DOI
https://doi.org/10.38124/ijisrt/25sep544
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Comparison of Project Duration Optimization for Speed Boat Production Using PERT and Critical Chain Project Management Methods (Case Study: CV. Rahman Jaya Abadi)

Aidawayati Rangkuti, R Aulia
Management and Optimization Techniques
article

Comparison of Project Duration Optimization for Speed Boat Production Using PERT and Critical Chain Project Management Methods (Case Study: CV. Rahman Jaya Abadi)

Aidawayati Rangkuti, R Aulia
article en

Abstract

This study aims to determine which method yields the shortest project duration between the Program Evaluation and Review Technique (PERT) and Critical Chain Project Management (CCPM). The results indicate that CCPM produces a faster project completion time. With the addition of buffers, the project completion duration using CCPM is 28,5 days. In comparison, the shortest project duration with the PERT method requires 35 days with a success probability of 0,13%, while the longest duration is 45 days with a success probability of 99,87%.

Openalex Percentile: Top 63%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Comparison of Project Duration Optimization for Speed Boat Production Using PERT and Critical Chain Project Management Methods (Case Study: CV. Rahman Jaya Abadi) — Aidawayati Rangkuti, R Aulia · (2025) | TGRS Research Map | TGRS