Solar Power System Installation and Power Quality Analysis at Pesantren Hubbul Khoir Indonesia

Electricity is very crucial in human life today. Electricity is used in communication, education, offices, household appliances, and transportation. Unfortunately, most of the electricity in Indonesia is still generated by fossil fuels such as coal. There needs to be a transition to renewable electrical energy generation so that electricity can be produced continuously. One option is solar power generation. Solar panels use radiation from the sun to generate electricity. Indonesia, which is located on the equator, has an advantage in solar power generation. Every region in Indonesia gets sunlight for a full year. This paper describes the analysis of the 1.62 kWp solar power generation system installed at Hubbul Khoir Islamic Boarding School. The analysis includes economic analysis, power quality analysis, and power quality analysis from an economic point of view. The results obtained by the PLTS system will return capital in 6.8 years and can get Rp20,871,282.00 after 25 years, the power quality of the PLTS system is good, and the power quality can affect from an economic point of view.

Authors

Institutions

Publication Details

Journal
Nusantara Science and Technology Proceedings
Published
2025-09-18
DOI
https://doi.org/10.11594/nstp.2025.5007
Primary Topic
Photovoltaic System Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Solar Power System Installation and Power Quality Analysis at Pesantren Hubbul Khoir Indonesia

Meiyanto Eko Sulistyo, Sutrisno Ibrahim, Subuh Pramono, Muhammad Hamka Ibrahim et al.
Nusantara Science and Technology Proceedings
Photovoltaic System Optimization Techniques
article

Solar Power System Installation and Power Quality Analysis at Pesantren Hubbul Khoir Indonesia

Meiyanto Eko Sulistyo, Sutrisno Ibrahim, Subuh Pramono, Muhammad Hamka Ibrahim, Faisal Rahutomo, Muhammad Nizam, Joko Hariyono, Adriel Satrio Nugroho
article en

Abstract

Electricity is very crucial in human life today. Electricity is used in communication, education, offices, household appliances, and transportation. Unfortunately, most of the electricity in Indonesia is still generated by fossil fuels such as coal. There needs to be a transition to renewable electrical energy generation so that electricity can be produced continuously. One option is solar power generation. Solar panels use radiation from the sun to generate electricity. Indonesia, which is located on the equator, has an advantage in solar power generation. Every region in Indonesia gets sunlight for a full year. This paper describes the analysis of the 1.62 kWp solar power generation system installed at Hubbul Khoir Islamic Boarding School. The analysis includes economic analysis, power quality analysis, and power quality analysis from an economic point of view. The results obtained by the PLTS system will return capital in 6.8 years and can get Rp20,871,282.00 after 25 years, the power quality of the PLTS system is good, and the power quality can affect from an economic point of view.

Nusantara Science and Technology Proceedings
Sebelas Maret University (ID)
Openalex Percentile: Top 83%
Photovoltaic System Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Solar Power System Installation and Power Quality Analysis at Pesantren Hubbul Khoir Indonesia — Meiyanto Eko Sulistyo, Sutrisno Ibrahim, et al. · Nusantara Science and Technology Proceedings (2025) | TGRS Research Map | TGRS