Doing transit infrastructure otherwise: <i>Arts in Transit</i> , <i>the Southwest Corridor</i>

The Arts in Transit project, which took place in Boston, Massachusetts in the 1980s, offers an example of transit art and transit art practice with the potential for engagement with, and agency through, infrastructure. In 1984, the Massachusetts Bay Transportation Authority (MBTA) relocated Boston’s Orange Line from an elevated track to an underground heavy rail system along a 4.7-mile stretch of land referred to as the Southwest Corridor. Arts in Transit was designed and managed by UrbanArts, Inc. as a subcontractee of the MBTA, and installed public art in nine new transportation facilities along the Southwest Corridor through a community-involved process of artwork selection. Though Arts in Transit was a familiar project locally during its time, it is relatively unknown to a wider audience. Through previously unexamined archival materials and interviews with participants, this historical case study uncovers Arts in Transit ’s potential for doing infrastructure otherwise through the process and practice of transit art, revealing the processes in which community groups affirmed the sociotechnical nature of mobility infrastructure through the visual.

Authors

Institutions

Publication Details

Journal
Urban Studies
Published
2025-09-18
DOI
https://doi.org/10.1177/00420980251362086
Primary Topic
Geographies of human-animal interactions
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Doing transit infrastructure otherwise: Arts in Transit , the Southwest Corridor

Rebecca Heimel
Urban Studies
Geographies of human-animal interactions
article

Doing transit infrastructure otherwise: Arts in Transit , the Southwest Corridor

Rebecca Heimel
article en

Abstract

The Arts in Transit project, which took place in Boston, Massachusetts in the 1980s, offers an example of transit art and transit art practice with the potential for engagement with, and agency through, infrastructure. In 1984, the Massachusetts Bay Transportation Authority (MBTA) relocated Boston’s Orange Line from an elevated track to an underground heavy rail system along a 4.7-mile stretch of land referred to as the Southwest Corridor. Arts in Transit was designed and managed by UrbanArts, Inc. as a subcontractee of the MBTA, and installed public art in nine new transportation facilities along the Southwest Corridor through a community-involved process of artwork selection. Though Arts in Transit was a familiar project locally during its time, it is relatively unknown to a wider audience. Through previously unexamined archival materials and interviews with participants, this historical case study uncovers Arts in Transit ’s potential for doing infrastructure otherwise through the process and practice of transit art, revealing the processes in which community groups affirmed the sociotechnical nature of mobility infrastructure through the visual.

Urban Studies
University of Sussex (GB)
Openalex Percentile: Top 69%
Geographies of human-animal interactions
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.