Design of Residual Coal Cleaning System for Train Wagons Based on PLC

In this paper, a set of PLC-based train wagons residual coal cleaning system is proposed for the time-consuming, laborious, inefficient and other problems of manual cleaning of residual coal in coal train wagons. The system includes two components: mechanical system and control system. Among them, the mechanical system includes two parts: the crane and the cleaning device; the control system consists of hardware and software parts. In this paper, we first determine the control program of the train wagons residual coal cleaning system, and select the main components in the system. After clarifying the control mode of the whole system, it completes the writing of the control program and the development of the host computer software. Finally, after the system test, the residual coal cleaning system can automatically identify the wagon number and locate the position of the wagon, and clean up the residual coal with high efficiency and intelligence. In the test process, the system only needs 3 minutes and 30 seconds to complete the efficient cleaning of the residual coal in the wagon, and the test results show that the whole set of system cleaning effect is good.

Authors

Institutions

Publication Details

Published
2025-05-09
DOI
https://doi.org/10.1145/3756423.3756465
Primary Topic
Industrial Technology and Control Systems
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Design of Residual Coal Cleaning System for Train Wagons Based on PLC

Haosen Liu, Yimin Zhu, Chengliang Zhang, Guangjun Gao
Industrial Technology and Control Systems
article

Design of Residual Coal Cleaning System for Train Wagons Based on PLC

Haosen Liu, Yimin Zhu, Chengliang Zhang, Guangjun Gao
article en

Abstract

In this paper, a set of PLC-based train wagons residual coal cleaning system is proposed for the time-consuming, laborious, inefficient and other problems of manual cleaning of residual coal in coal train wagons. The system includes two components: mechanical system and control system. Among them, the mechanical system includes two parts: the crane and the cleaning device; the control system consists of hardware and software parts. In this paper, we first determine the control program of the train wagons residual coal cleaning system, and select the main components in the system. After clarifying the control mode of the whole system, it completes the writing of the control program and the development of the host computer software. Finally, after the system test, the residual coal cleaning system can automatically identify the wagon number and locate the position of the wagon, and clean up the residual coal with high efficiency and intelligence. In the test process, the system only needs 3 minutes and 30 seconds to complete the efficient cleaning of the residual coal in the wagon, and the test results show that the whole set of system cleaning effect is good.

University of Jinan (CN), Zoucheng People's Hospital (CN)
Openalex Percentile: Top 69%
Industrial Technology and Control Systems
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.