Rubber (Latex) Cutting Process Considering the Cost of the Double Cut Alternative (DCA) Process in Human and Robot Collaboration

Technological developments allow human-robot collaboration resources to be carried out in the rubber (latex) cutting process in plantations. The human-robot collaboration activities are carried out simultaneously in each rubber tree but have different work tasks. Research regarding human-robot collaboration resource costs in the rubber (latex) cutting process activity is still minimal, so it is necessary to discuss and calculate the resource costs of human-robot collaboration by developing mathematical models. Research regarding the resource costs of human-robot collaboration in the rubber (latex) cutting process is still minimal, so discussion and calculations are needed with the development of mathematical models. Mathematical model development is not just a theoretical exercise. The practical goal is to minimize costs by considering human resources, robots, and human-robot collaboration. Through rigorous testing, we aim to minimize the cost of each resource. Test results show that human-robot collaboration resources can significantly influence cost minimization. Cost minimization is accomplished by programming an algorithm in optimization software. This program is used to make it easier to complete the optimal solution in terms of relatively fast time, which refers to the precedence diagram of the rubber (latex) cutting process.Based on the results of experimental data, the development of a mathematical model functions logically to solve resource placement problems, resulting in a minimum cost of IDR 1,618,234,564,595, total human resources of 1 person and robot resources of 1 unit.

Authors

Publication Details

Journal
Journal of Research in Industrial Engineering and Management
Published
2024-11-30
DOI
https://doi.org/10.61221/jriem.v2i2.41
Primary Topic
Manufacturing Process and Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Rubber (Latex) Cutting Process Considering the Cost of the Double Cut Alternative (DCA) Process in Human and Robot Collaboration

Ali Akbar, Anas Ma’ruf
Journal of Research in Industrial Engineering and Management
Manufacturing Process and Optimization
article

Rubber (Latex) Cutting Process Considering the Cost of the Double Cut Alternative (DCA) Process in Human and Robot Collaboration

Ali Akbar, Anas Ma’ruf
article en

Abstract

Technological developments allow human-robot collaboration resources to be carried out in the rubber (latex) cutting process in plantations. The human-robot collaboration activities are carried out simultaneously in each rubber tree but have different work tasks. Research regarding human-robot collaboration resource costs in the rubber (latex) cutting process activity is still minimal, so it is necessary to discuss and calculate the resource costs of human-robot collaboration by developing mathematical models. Research regarding the resource costs of human-robot collaboration in the rubber (latex) cutting process is still minimal, so discussion and calculations are needed with the development of mathematical models. Mathematical model development is not just a theoretical exercise. The practical goal is to minimize costs by considering human resources, robots, and human-robot collaboration. Through rigorous testing, we aim to minimize the cost of each resource. Test results show that human-robot collaboration resources can significantly influence cost minimization. Cost minimization is accomplished by programming an algorithm in optimization software. This program is used to make it easier to complete the optimal solution in terms of relatively fast time, which refers to the precedence diagram of the rubber (latex) cutting process.Based on the results of experimental data, the development of a mathematical model functions logically to solve resource placement problems, resulting in a minimum cost of IDR 1,618,234,564,595, total human resources of 1 person and robot resources of 1 unit.

Journal of Research in Industrial Engineering and ManagementVol. 2(2)
Openalex Percentile: Top 55%
Manufacturing Process and Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Rubber (Latex) Cutting Process Considering the Cost of the Double Cut Alternative (DCA) Process in Human and Robot Collaboration — Ali Akbar, Anas Ma’ruf · Journal of Research in Industrial Engineering and Management (2024) | TGRS Research Map | TGRS