A cost-optimal predictive operation scheme for sector-coupled energy plants with start-up delays and start-up costs
In this work we present a cost-optimal energy management scheme for sector-coupled energy plants, focusing on systems that enable gas-to-electricity, gas-to-heat, and power-to-heat conversions. To capture realistic operational challenges, the considered system model incorporates dynamic constraints, including start-up delays and off-time-dependent start-up costs. By accounting for the impact of these factors, we demonstrate on a case study that they can significantly reduce overall operational costs. The energy management problem is cast as a mixed-integer nonlinear programming (MINLP) problem, which is then solved within a model predictive control (MPC) framework. The proposed approach provides a structured methodology for real-time energy management, enhancing energy efficiency while minimizing costs.
Authors
- Juan E. Machado (ORCID: https://orcid.org/0000-0003-4753-4133)
- Johannes Schiffer (ORCID: https://orcid.org/0000-0001-5639-4326)
- Gökçen Devlet Şen
Institutions
- Fraunhofer Research Institution for Energy Infrastructures and Geotechnologies IEG (DE)
- Brandenburg University of Technology Cottbus-Senftenberg (DE)
Publication Details
- Journal
- IFAC-PapersOnLine
- Published
- 2025-01-01
- DOI
- https://doi.org/10.1016/j.ifacol.2025.08.143
- Primary Topic
- Smart Grid Energy Management
- Type
- article
- Field-Weighted Citation Impact
- 0.00