Integrated production applied to building rehabilitation in the São Paulo historic center

The particularities of building rehabilitation projects evidence the limitations of conventional production management approaches. The aim of this work is to analyze the process of building rehabilitation from an integrated production view. The approach is based on collaborative work and early participation of all agents to improve efficiency of the process and quality of the building. Interviews were conducted with two professionals that work with rehabilitation and also the assessment of the production process of a rehabilitated building in São Paulo, Brazil. It is argued that the adoption of measures aimed at eliminating the linearity of production phases optimizes the process, especially in cases of rehabilitation, due to their particularities in relation to new projects.

Authors

Institutions

Publication Details

Journal
Revista de Arquitetura IMED
Published
2025-09-16
DOI
https://doi.org/10.18256/2318-1109.2025.v14i1.4996
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Integrated production applied to building rehabilitation in the São Paulo historic center

Marcelo Eduardo Giacaglia, A. Oliveira
Revista de Arquitetura IMED
BIM and Construction Integration
article

Integrated production applied to building rehabilitation in the São Paulo historic center

Marcelo Eduardo Giacaglia, A. Oliveira
article en

Abstract

The particularities of building rehabilitation projects evidence the limitations of conventional production management approaches. The aim of this work is to analyze the process of building rehabilitation from an integrated production view. The approach is based on collaborative work and early participation of all agents to improve efficiency of the process and quality of the building. Interviews were conducted with two professionals that work with rehabilitation and also the assessment of the production process of a rehabilitated building in São Paulo, Brazil. It is argued that the adoption of measures aimed at eliminating the linearity of production phases optimizes the process, especially in cases of rehabilitation, due to their particularities in relation to new projects.

Revista de Arquitetura IMEDVol. 14(1)
Universidade de São Paulo (BR), Universidade Nova de Lisboa (PT)
Openalex Percentile: Top 73%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.