Machine Learning–Augmented Optimization of Large Bilevel and Two-Stage Stochastic Programs: Application to Cycling Network Design

Problem definition: A wide range of decision problems can be formulated as bilevel programs with independent followers, which, as a special case, include two-stage stochastic programs. These problems are notoriously difficult to solve, especially when a large number of followers are present. Motivated by a real-world cycling infrastructure planning application, we present a general approach to solving such problems. Methodology/results: We propose an optimization model that explicitly considers a sampled subset of followers and exploits a machine learning model to estimate the objective values of unsampled followers. We prove bounds on the optimality gap of the generated leader decision as measured by the original objective function that considers the full follower set. We then develop follower sampling algorithms to tighten the bounds and a representation learning approach to learn follower features, which are used as inputs to the embedded machine learning model. Through numerical studies, we show that our approach generates leader decisions of higher quality compared with baselines. Finally, in collaboration with the City of Toronto, we perform a real-world case study in Toronto, where we solve a cycling network design problem with over one million followers. Compared with the current practice, our approach improves Toronto’s cycling accessibility by 19.2%, equivalent to $18 million in potential cost savings. Managerial implications: Our approach is being used to inform the cycling infrastructure planning in Toronto and can be generalized to any decision problems that are formulated as bilevel programs with independent followers. Funding: This work was supported by City of Toronto Transportation Services and the Natural Sciences and Engineering Research Council of Canada [NSERC Alliance Grant ALLRP 561212-20]. Supplemental Material: The electronic companion is available at https://doi.org/10.1287/msom.2024.1317 .

Authors

Institutions

Publication Details

Journal
Manufacturing & Service Operations Management
Published
2025-09-17
DOI
https://doi.org/10.1287/msom.2024.1317
Citations
2
Primary Topic
Transportation Planning and Optimization
Type
article
Field-Weighted Citation Impact
4.35
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Machine Learning–Augmented Optimization of Large Bilevel and Two-Stage Stochastic Programs: Application to Cycling Network Design

Shoshanna Saxe, Bo Lin, Timothy C. Y. Chan
2 citations
Manufacturing & Service Operations Management
Transportation Planning and Optimization
4.35
article

Machine Learning–Augmented Optimization of Large Bilevel and Two-Stage Stochastic Programs: Application to Cycling Network Design

Shoshanna Saxe, Bo Lin, Timothy C. Y. Chan
article en
2 citations

Abstract

Problem definition: A wide range of decision problems can be formulated as bilevel programs with independent followers, which, as a special case, include two-stage stochastic programs. These problems are notoriously difficult to solve, especially when a large number of followers are present. Motivated by a real-world cycling infrastructure planning application, we present a general approach to solving such problems. Methodology/results: We propose an optimization model that explicitly considers a sampled subset of followers and exploits a machine learning model to estimate the objective values of unsampled followers. We prove bounds on the optimality gap of the generated leader decision as measured by the original objective function that considers the full follower set. We then develop follower sampling algorithms to tighten the bounds and a representation learning approach to learn follower features, which are used as inputs to the embedded machine learning model. Through numerical studies, we show that our approach generates leader decisions of higher quality compared with baselines. Finally, in collaboration with the City of Toronto, we perform a real-world case study in Toronto, where we solve a cycling network design problem with over one million followers. Compared with the current practice, our approach improves Toronto’s cycling accessibility by 19.2%, equivalent to $18 million in potential cost savings. Managerial implications: Our approach is being used to inform the cycling infrastructure planning in Toronto and can be generalized to any decision problems that are formulated as bilevel programs with independent followers. Funding: This work was supported by City of Toronto Transportation Services and the Natural Sciences and Engineering Research Council of Canada [NSERC Alliance Grant ALLRP 561212-20]. Supplemental Material: The electronic companion is available at https://doi.org/10.1287/msom.2024.1317 .

Manufacturing & Service Operations ManagementVol. 27(6)
University of Toronto (CA)
Openalex Percentile: Top 6%
Transportation Planning and Optimization
4.35
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.