Redesenho do layout produtivo com base em Cronoanálise e Lean Manufacturing: estudo de caso em uma indústria metalmecânica

he inadequate arrangement of equipment and sectors in a manufacturing environment can significantly compromise the efficiency of production processes. This article presents a case study of a metalworking company, whose objective was to optimize the production layout by applying chronoanalysis, quality tools and Lean Manufacturing principles. The investigation began with a detailed mapping of the steps involved in the production of two key parts, called “male” and “female”, totaling 73 operations analyzed. The data collected allowed the identification of bottlenecks, excessive movements and activities that did not add value to the final product. Based on this, the proposal was to reorganize the layout in a “U” shape, reconfigure internal flows and adopt standardization and visual management practices. The implementation of the improvements resulted in reduced manufacturing time, increased productivity, better use of physical space and reduced waste. The analysis of the heat map confirmed the effectiveness of the intervention by highlighting the elimination of critical movement zones. The results demonstrate that the integrated use of production engineering approaches can generate significant impacts on the operational efficiency of micro and small industries.

Authors

Institutions

Publication Details

Journal
Brazilian Journal of Production Engineering
Published
2025-09-12
DOI
https://doi.org/10.47456/bjpe.v11i3.48753
Primary Topic
Operations Management Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Redesenho do layout produtivo com base em Cronoanálise e Lean Manufacturing: estudo de caso em uma indústria metalmecânica

Misael Yuri Inácio Silva, Rafael de Lima Santos, João Evangelista Dantas dos Santos
Brazilian Journal of Production Engineering
Operations Management Techniques
article

Redesenho do layout produtivo com base em Cronoanálise e Lean Manufacturing: estudo de caso em uma indústria metalmecânica

Misael Yuri Inácio Silva, Rafael de Lima Santos, João Evangelista Dantas dos Santos
article en

Abstract

he inadequate arrangement of equipment and sectors in a manufacturing environment can significantly compromise the efficiency of production processes. This article presents a case study of a metalworking company, whose objective was to optimize the production layout by applying chronoanalysis, quality tools and Lean Manufacturing principles. The investigation began with a detailed mapping of the steps involved in the production of two key parts, called “male” and “female”, totaling 73 operations analyzed. The data collected allowed the identification of bottlenecks, excessive movements and activities that did not add value to the final product. Based on this, the proposal was to reorganize the layout in a “U” shape, reconfigure internal flows and adopt standardization and visual management practices. The implementation of the improvements resulted in reduced manufacturing time, increased productivity, better use of physical space and reduced waste. The analysis of the heat map confirmed the effectiveness of the intervention by highlighting the elimination of critical movement zones. The results demonstrate that the integrated use of production engineering approaches can generate significant impacts on the operational efficiency of micro and small industries.

Brazilian Journal of Production EngineeringVol. 11(3)
Universidade Federal do Ceará (BR), Universidade Regional do Cariri (BR)
Openalex Percentile: Top 70%
Operations Management Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Redesenho do layout produtivo com base em Cronoanálise e Lean Manufacturing: estudo de caso em uma indústria metalmecânica — Misael Yuri Inácio Silva, Rafael de Lima Santos, et al. · Brazilian Journal of Production Engineering (2025) | TGRS Research Map | TGRS