Indicators in the Performance Evaluation Rubric for Supervision Consultants in Toll Road Construction Projects

The construction of toll roads is a key government program aimed at enhancing public productivity and accelerating national economic growth. To ensure that toll road construction meets the desired quality, time, and cost objectives, the involvement of competent supervision consultants is essential. However, suboptimal performance of these consultants often leads to less-than-ideal project outcomes. This study aimed to analyse the performance evaluation indicators of supervision consultants and incorporate them into a comprehensive performance assessment rubric for supervision consultants in toll road construction projects. The research methodology combined literature review, questionnaire surveys, and expert interviews for data collection. Then, each indication is ranked and weighted using the Rank Order Centroid (ROC) and Technique for Order Preference by Similarity to Ideal Solution (TOPSIS) approaches. The results showed that respondents and experts identified 18 important indicators grouped into three categories soft skills, technical skills, and project supervision which can be used in a validated performance assessment rubric for evaluating supervision consultants in toll road construction projects.

Authors

Institutions

Publication Details

Journal
Journal La Multiapp
Published
2025-09-15
DOI
https://doi.org/10.37899/journallamultiapp.v6i5.2318
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Indicators in the Performance Evaluation Rubric for Supervision Consultants in Toll Road Construction Projects

Ayomi Dita Rarasati, Wahyu Putra Rahman
Journal La Multiapp
BIM and Construction Integration
article

Indicators in the Performance Evaluation Rubric for Supervision Consultants in Toll Road Construction Projects

Ayomi Dita Rarasati, Wahyu Putra Rahman
article en

Abstract

The construction of toll roads is a key government program aimed at enhancing public productivity and accelerating national economic growth. To ensure that toll road construction meets the desired quality, time, and cost objectives, the involvement of competent supervision consultants is essential. However, suboptimal performance of these consultants often leads to less-than-ideal project outcomes. This study aimed to analyse the performance evaluation indicators of supervision consultants and incorporate them into a comprehensive performance assessment rubric for supervision consultants in toll road construction projects. The research methodology combined literature review, questionnaire surveys, and expert interviews for data collection. Then, each indication is ranked and weighted using the Rank Order Centroid (ROC) and Technique for Order Preference by Similarity to Ideal Solution (TOPSIS) approaches. The results showed that respondents and experts identified 18 important indicators grouped into three categories soft skills, technical skills, and project supervision which can be used in a validated performance assessment rubric for evaluating supervision consultants in toll road construction projects.

Journal La MultiappVol. 6(5)
University of Indonesia (ID), Kitasato Institute Hospital (JP)
Openalex Percentile: Top 73%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.