The compressor (C-100) located in the Hydrobon & Platforming I unit is designed to meet the need for recycled gas to keep the H2/HC ratio optimal in the Platforming I section and minimise the rate of coke formation in the reactor. In addition, a Compressor (C-100) is used during the start-up process of the Platforming I unit to maximise LPG production. However, PT X is currently focusing on reformatting production to meet market demand, which prompts considering commissioning a Compressor (C-100) for energy efficiency and cost savings. The shutdown of the previous compressor, which consumed 2400 kWh per day at an annual electricity cost of IDR 8,347,273,344.00, has significantly reduced energy consumption. However, other operational costs, such as maintenance and lube oil make-up, remained during the period, with annual expenses of IDR 440,036,956.00 and IDR 48,741,977.00, respectively. In addition, energy from alternative sources such as steam and cooling water also increased to maintain process performance, with total annual operating costs of IDR 56,256,360,451.20 and IDR 179,789,760.00, respectively. Overall, the operating cost of the Compressor (C-100), which includes electricity, make-up lube oil, and maintenance, totalled IDR 8,836,052,276.80 each year. A review of the compressor operation could provide a solution for cost optimisation and energy efficiency for the company.

Authors

Publication Details

Journal
Indonesian Research Journal On Education
Published
2024-12-26
DOI
https://doi.org/10.31004/irje.v4i4.1347
Primary Topic
Modeling, Simulation, and Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Cost Optimization Analysis of Energy Efficiency During Compressor Shutdown at Platforming Unit I

Budi Nugroho, Abdul Jalil, Zulkarnain Zulkarnain, Zahru Wilda Pratiwi et al.
Indonesian Research Journal On Education
Modeling, Simulation, and Optimization
article

Cost Optimization Analysis of Energy Efficiency During Compressor Shutdown at Platforming Unit I

Budi Nugroho, Abdul Jalil, Zulkarnain Zulkarnain, Zahru Wilda Pratiwi, Lian Safitri, Wanda Trihadi
article en

Abstract

The compressor (C-100) located in the Hydrobon & Platforming I unit is designed to meet the need for recycled gas to keep the H2/HC ratio optimal in the Platforming I section and minimise the rate of coke formation in the reactor. In addition, a Compressor (C-100) is used during the start-up process of the Platforming I unit to maximise LPG production. However, PT X is currently focusing on reformatting production to meet market demand, which prompts considering commissioning a Compressor (C-100) for energy efficiency and cost savings. The shutdown of the previous compressor, which consumed 2400 kWh per day at an annual electricity cost of IDR 8,347,273,344.00, has significantly reduced energy consumption. However, other operational costs, such as maintenance and lube oil make-up, remained during the period, with annual expenses of IDR 440,036,956.00 and IDR 48,741,977.00, respectively. In addition, energy from alternative sources such as steam and cooling water also increased to maintain process performance, with total annual operating costs of IDR 56,256,360,451.20 and IDR 179,789,760.00, respectively. Overall, the operating cost of the Compressor (C-100), which includes electricity, make-up lube oil, and maintenance, totalled IDR 8,836,052,276.80 each year. A review of the compressor operation could provide a solution for cost optimisation and energy efficiency for the company.

Indonesian Research Journal On EducationVol. 4(4)
Openalex Percentile: Top 53%
Modeling, Simulation, and Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Cost Optimization Analysis of Energy Efficiency During Compressor Shutdown at Platforming Unit I — Budi Nugroho, Abdul Jalil, et al. · Indonesian Research Journal On Education (2024) | TGRS Research Map | TGRS