Fishbone Quality Control Tool for Enhancing Effective Building Project Delivery in Bayelsa State, Nigeria

This study is on fish bone quality control tool for enhancing effective building project delivery in Bayelsa State, with the aim of determining whether the use of fish bone as a quality control tool enhances effective building project delivery in Bayelsa State. The population for the study was 188, consisting of 83 building professional lectures in tertiary institutions and 105 building professionals in ministries, departments and authorities in Bayelsa State. The study adopted analytical descriptive survey design. Questionnaire was used to collect needed data from the respondents, using 4-point Likert rating scale. Cronbach Alpha method was used for testing the reliability of the instrument and reliability coefficient of 0.79 was obtained. The research question was answered using the mean and standard deviation while t-test statistics was used to test the null-hypothesis at 0.05 level of significance. Finding revealed that fishbone as quality control tool enhances effective building project delivery in Bayelsa State. Result obtained showed that there was no significant difference in the mean response score of both building professional lecturers in tertiary institutions and building professionals in ministries, departments and authorities on fishbone as a quality control tool for enhancing effective building project delivery in Bayelsa State. Therefore, it was concluded that fishbone is a quality control tool for effective building project delivery. Based on the findings, it was recommended that building construction professionals be encouraged to adopt and implement the use of fishbone diagram as a quality control tool for enhancing effective project delivery in Bayelsa State. Keywords: Construction, Building, Professionals, Quality Control, Fishbone Diagram

Authors

Institutions

Publication Details

Journal
International Journal of Research and Review
Published
2025-09-15
DOI
https://doi.org/10.52403/ijrr.20250924
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Fishbone Quality Control Tool for Enhancing Effective Building Project Delivery in Bayelsa State, Nigeria

Japo Oweikeye Morto Amasuomo, Julius Atose
International Journal of Research and Review
Construction Project Management and Performance
article

Fishbone Quality Control Tool for Enhancing Effective Building Project Delivery in Bayelsa State, Nigeria

Japo Oweikeye Morto Amasuomo, Julius Atose
article en

Abstract

This study is on fish bone quality control tool for enhancing effective building project delivery in Bayelsa State, with the aim of determining whether the use of fish bone as a quality control tool enhances effective building project delivery in Bayelsa State. The population for the study was 188, consisting of 83 building professional lectures in tertiary institutions and 105 building professionals in ministries, departments and authorities in Bayelsa State. The study adopted analytical descriptive survey design. Questionnaire was used to collect needed data from the respondents, using 4-point Likert rating scale. Cronbach Alpha method was used for testing the reliability of the instrument and reliability coefficient of 0.79 was obtained. The research question was answered using the mean and standard deviation while t-test statistics was used to test the null-hypothesis at 0.05 level of significance. Finding revealed that fishbone as quality control tool enhances effective building project delivery in Bayelsa State. Result obtained showed that there was no significant difference in the mean response score of both building professional lecturers in tertiary institutions and building professionals in ministries, departments and authorities on fishbone as a quality control tool for enhancing effective building project delivery in Bayelsa State. Therefore, it was concluded that fishbone is a quality control tool for effective building project delivery. Based on the findings, it was recommended that building construction professionals be encouraged to adopt and implement the use of fishbone diagram as a quality control tool for enhancing effective project delivery in Bayelsa State. Keywords: Construction, Building, Professionals, Quality Control, Fishbone Diagram

International Journal of Research and ReviewVol. 12(9)
Niger Delta University (NG)
Openalex Percentile: Top 71%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Fishbone Quality Control Tool for Enhancing Effective Building Project Delivery in Bayelsa State, Nigeria — Japo Oweikeye Morto Amasuomo, Julius Atose · International Journal of Research and Review (2025) | TGRS Research Map | TGRS