PROGNOSIS OF THE LOAD -BEARING CAPACITY OF DRILLING PILES BY NUMERICAL METHOD OF BOUNDARY ELEMENTS BASED ON THE RESULTS OF ANALYSIS OF THEIR STRESS STATE

Construction is one of the leading sectors of the national economy in the historical aspect of its development. Prevention of destruction of structures is a very important task of construction, so a quantitative measure of strength of the foundation of the structure is required. The tasks of improving engineering solutions require designers in search of unused reserves for improving the efficiency of construction, introducing the achievements of science in design practice. One of the main areas is the further involvement of mathematical methods and computers in design practice. Successful construction of buildings requires constant development of the basics of mechanics and geomechanics. The current trend of increasing the number of floors of buildings to 9-12 floors leads to a significant increase in the load on the foundations. For such structures, piles have to be driven in 2-3 rows, the grillage becomes wide, and the cost of reinforcement for it is significant, so the overall effect of using driven piles is reduced. The solution to the problem of reducing the cost and reducing the time of completion of zero-cycle works is most facilitated by the use of bored piles. This is also facilitated by the transition to building with increased number of floors. Bored piles are characterized by high bearing capacity and their arrangement does not have a dynamic effect on the structures of neighboring buildings and structures. The latter circumstance is important when building within urban areas. The use of bored pile technology also allows the use of deepening to a specific pile mark. The aim of the work is to conduct numerical simulation of the resistance of a bored pile under conditions of nonlinear deformation of the soil base on a computer. The growing capabilities of modern computers require constant revision of existing numerical methods for the study of new classes of problems for which there is hope for a solution. One of such topical problems is the nonlinear problem of geomechanics of the behavior of bored piles under load.

Authors

Institutions

Publication Details

Journal
Modern technology materials and design in construction
Published
2025-09-16
DOI
https://doi.org/10.31649/2311-1429-2025-1-62-67
Primary Topic
Engineering Diagnostics and Reliability
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

PROGNOSIS OF THE LOAD -BEARING CAPACITY OF DRILLING PILES BY NUMERICAL METHOD OF BOUNDARY ELEMENTS BASED ON THE RESULTS OF ANALYSIS OF THEIR STRESS STATE

Alla Morgun, Zhengfeng Tian
Modern technology materials and design in construction
Engineering Diagnostics and Reliability
article

PROGNOSIS OF THE LOAD -BEARING CAPACITY OF DRILLING PILES BY NUMERICAL METHOD OF BOUNDARY ELEMENTS BASED ON THE RESULTS OF ANALYSIS OF THEIR STRESS STATE

Alla Morgun, Zhengfeng Tian
article en

Abstract

Construction is one of the leading sectors of the national economy in the historical aspect of its development. Prevention of destruction of structures is a very important task of construction, so a quantitative measure of strength of the foundation of the structure is required. The tasks of improving engineering solutions require designers in search of unused reserves for improving the efficiency of construction, introducing the achievements of science in design practice. One of the main areas is the further involvement of mathematical methods and computers in design practice. Successful construction of buildings requires constant development of the basics of mechanics and geomechanics. The current trend of increasing the number of floors of buildings to 9-12 floors leads to a significant increase in the load on the foundations. For such structures, piles have to be driven in 2-3 rows, the grillage becomes wide, and the cost of reinforcement for it is significant, so the overall effect of using driven piles is reduced. The solution to the problem of reducing the cost and reducing the time of completion of zero-cycle works is most facilitated by the use of bored piles. This is also facilitated by the transition to building with increased number of floors. Bored piles are characterized by high bearing capacity and their arrangement does not have a dynamic effect on the structures of neighboring buildings and structures. The latter circumstance is important when building within urban areas. The use of bored pile technology also allows the use of deepening to a specific pile mark. The aim of the work is to conduct numerical simulation of the resistance of a bored pile under conditions of nonlinear deformation of the soil base on a computer. The growing capabilities of modern computers require constant revision of existing numerical methods for the study of new classes of problems for which there is hope for a solution. One of such topical problems is the nonlinear problem of geomechanics of the behavior of bored piles under load.

Modern technology materials and design in constructionVol. 38(1)
Institute for Postgraduate Medical Education (CZ), Vinnytsia National Technical University (UA)
Openalex Percentile: Top 72%
Engineering Diagnostics and Reliability
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.