RESTORATION OF POWER SYSTEM BIH AFTER BLACKOUT

The paper will describe the steps taken during the restoration of the BiH EES after the power outage that occurred on June 21, 2024. The restoration of the EES according to the BiH EES Restoration Plan can be carried out in two ways, top-down or bottom-up. Due to the presence of voltage on three cross-border transmission lines (TIE), the NOSBiH dispatchers decided on the top-down method, which was the fastest restoration process. Taking into account the active power on the TIE, i.e. the limitations defined by the Transmission System Operation Agreement between transmission system operators, NOSBiH dispatchers began restoration from TS Ugljevik and TS Sarajevo on 20. The paper will explain in detail the manipulations and procedures that enabled the restoration of the BiH EES within two hours. During the restoration of the system, care was taken to restore voltage to priority consumers as soon as possible, such as hospitals, water supply systems and key infrastructure. Also, efforts were made to transfer voltage to production facilities (hydro generators in order to ensure sufficient electricity to supply end consumers) as soon as possible, as well as to thermal generators that were in operation before the outage. A major problem during the resynchronization of the system was the voltage conditions, namely the increased voltages in the southern part of BiH.

Authors

Publication Details

Published
2025-01-01
DOI
https://doi.org/10.46793/cigre37.c2.02
Primary Topic
Power Systems and Technologies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

RESTORATION OF POWER SYSTEM BIH AFTER BLACKOUT

Bojan Rebić, A. Muharemović, Mladen Jovović, Tanja Janjić
Power Systems and Technologies
article

RESTORATION OF POWER SYSTEM BIH AFTER BLACKOUT

Bojan Rebić, A. Muharemović, Mladen Jovović, Tanja Janjić
article en

Abstract

The paper will describe the steps taken during the restoration of the BiH EES after the power outage that occurred on June 21, 2024. The restoration of the EES according to the BiH EES Restoration Plan can be carried out in two ways, top-down or bottom-up. Due to the presence of voltage on three cross-border transmission lines (TIE), the NOSBiH dispatchers decided on the top-down method, which was the fastest restoration process. Taking into account the active power on the TIE, i.e. the limitations defined by the Transmission System Operation Agreement between transmission system operators, NOSBiH dispatchers began restoration from TS Ugljevik and TS Sarajevo on 20. The paper will explain in detail the manipulations and procedures that enabled the restoration of the BiH EES within two hours. During the restoration of the system, care was taken to restore voltage to priority consumers as soon as possible, such as hospitals, water supply systems and key infrastructure. Also, efforts were made to transfer voltage to production facilities (hydro generators in order to ensure sufficient electricity to supply end consumers) as soon as possible, as well as to thermal generators that were in operation before the outage. A major problem during the resynchronization of the system was the voltage conditions, namely the increased voltages in the southern part of BiH.

Openalex Percentile: Top 76%
Power Systems and Technologies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.