Balance Scorecard Strategy for the West Wanagon Slope Stability (Wwss) Grasberg Earthworks Industri Mining Project (Case Study: Pt. Xzy, Papua)

This study aims to analyze the implementation of the Balanced Scorecard (BSC) as a performance management tool in the West Wanagon Slope Stability (WWSS) project carried out by PT XZY at the Grasberg mine, Papua. The WWSS project plays a critical role in post-mining slope stabilization to minimize landslide risks and environmental impacts. Performance issues recorded between 2021 and 2024 include damaged or uncalibrated instruments (-8% from the > 95% target), limited predictive landslide analysis (+4 from the target of zero incidents), suboptimal geotechnical design and modeling (-0.15 from the ≥1.3% target), and unstable telemetry networks (-13% from the ≥ 98% target). The research applied a mixed-method approach, combining quantitative financial ratio analysis (NPM, ROI, ROE) and statistical correlations with qualitative methods through questionnaires and in-depth interviews involving 100 respondents across various levels. The findings demonstrate that BSC provides a more holistic and measurable framework for managing project performance, with the highest score in the Environmental & Social perspective, followed by Financial, Stakeholder, Learning & Growth, and Internal Business Process perspectives. Recommended strategies derived from SWOT analysis and action plans include achieving zero fatality through early detection with real-time radar and deformation sensors, modernizing monitoring with integrated dashboards, strengthening human resources through training and certification in slope stability engineering, and ensuring cost control through risk-based budgeting and cost-benefit ratio audits.

Authors

Publication Details

Journal
International Journal of Innovative Research in Multidisciplinary Education
Published
2025-09-16
DOI
https://doi.org/10.58806/ijirme.2025.v4i9n07
Primary Topic
Mining Techniques and Economics
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Balance Scorecard Strategy for the West Wanagon Slope Stability (Wwss) Grasberg Earthworks Industri Mining Project (Case Study: Pt. Xzy, Papua)

Fuad Achmadi, Ellysa Nursanti, Yonpis Tabuni
International Journal of Innovative Research in Multidisciplinary Education
Mining Techniques and Economics
article

Balance Scorecard Strategy for the West Wanagon Slope Stability (Wwss) Grasberg Earthworks Industri Mining Project (Case Study: Pt. Xzy, Papua)

Fuad Achmadi, Ellysa Nursanti, Yonpis Tabuni
article en

Abstract

This study aims to analyze the implementation of the Balanced Scorecard (BSC) as a performance management tool in the West Wanagon Slope Stability (WWSS) project carried out by PT XZY at the Grasberg mine, Papua. The WWSS project plays a critical role in post-mining slope stabilization to minimize landslide risks and environmental impacts. Performance issues recorded between 2021 and 2024 include damaged or uncalibrated instruments (-8% from the > 95% target), limited predictive landslide analysis (+4 from the target of zero incidents), suboptimal geotechnical design and modeling (-0.15 from the ≥1.3% target), and unstable telemetry networks (-13% from the ≥ 98% target). The research applied a mixed-method approach, combining quantitative financial ratio analysis (NPM, ROI, ROE) and statistical correlations with qualitative methods through questionnaires and in-depth interviews involving 100 respondents across various levels. The findings demonstrate that BSC provides a more holistic and measurable framework for managing project performance, with the highest score in the Environmental & Social perspective, followed by Financial, Stakeholder, Learning & Growth, and Internal Business Process perspectives. Recommended strategies derived from SWOT analysis and action plans include achieving zero fatality through early detection with real-time radar and deformation sensors, modernizing monitoring with integrated dashboards, strengthening human resources through training and certification in slope stability engineering, and ensuring cost control through risk-based budgeting and cost-benefit ratio audits.

International Journal of Innovative Research in Multidisciplinary EducationVol. 04(09)
Openalex Percentile: Top 69%
Mining Techniques and Economics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.