BIM Model Autocorrection Algorithm Based on Work Breakdown Structure for a Petrochemical Plant

This study proposed an approach for the integrated management of the design and construction stages of a plant project using building information modeling (BIM). Particularly, an algorithm that converts design into a construction model in a three‐dimensional (3D) BIM environment was developed and applied to a petrochemical plant project in Indonesia. The algorithm extracts 3D geometry and design attributes from Autodesk Revit and plant design management system (PDMS) models, incorporates construction‐specific information (such as work breakdown structure (WBS), weld types, and spool segmentation), and generates a task‐aligned 3D construction model in a structured JavaScript object notation (JSON) format. Using Navisworks, the system visualizes progress across work packages and supports partial updates when design or construction data changes. This represents a unique and fully integrated approach to automate the transformation of BIM design models into construction‐phase models, a capability that has not been demonstrated in previous studies. The proposed method enhances the utility of 3D models on the construction site by improving construction traceability, workflow efficiency, and real‐time management. While the current implementation supports Revit and PDMS models, future research will address multiplatform compatibility with tools, such as Hexagon SmartPlant 3D. This study represents an important advancement in BIM‐based construction modeling and offers a foundation for digital transformation in the construction industry.

Authors

Institutions

Publication Details

Journal
Advances in Civil Engineering
Published
2025-01-01
DOI
https://doi.org/10.1155/adce/3356047
Citations
1
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
1.01
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

BIM Model Autocorrection Algorithm Based on Work Breakdown Structure for a Petrochemical Plant

Seung‐Hee Kim, Jong-Kyu Yun
1 citations
Advances in Civil Engineering
BIM and Construction Integration
1.01
article

BIM Model Autocorrection Algorithm Based on Work Breakdown Structure for a Petrochemical Plant

Seung‐Hee Kim, Jong-Kyu Yun
article en
1 citations

Abstract

This study proposed an approach for the integrated management of the design and construction stages of a plant project using building information modeling (BIM). Particularly, an algorithm that converts design into a construction model in a three‐dimensional (3D) BIM environment was developed and applied to a petrochemical plant project in Indonesia. The algorithm extracts 3D geometry and design attributes from Autodesk Revit and plant design management system (PDMS) models, incorporates construction‐specific information (such as work breakdown structure (WBS), weld types, and spool segmentation), and generates a task‐aligned 3D construction model in a structured JavaScript object notation (JSON) format. Using Navisworks, the system visualizes progress across work packages and supports partial updates when design or construction data changes. This represents a unique and fully integrated approach to automate the transformation of BIM design models into construction‐phase models, a capability that has not been demonstrated in previous studies. The proposed method enhances the utility of 3D models on the construction site by improving construction traceability, workflow efficiency, and real‐time management. While the current implementation supports Revit and PDMS models, future research will address multiplatform compatibility with tools, such as Hexagon SmartPlant 3D. This study represents an important advancement in BIM‐based construction modeling and offers a foundation for digital transformation in the construction industry.

Advances in Civil EngineeringVol. 2025(1)
Korea University of Technology and Education (KR)
Openalex Percentile: Top 20%
BIM and Construction Integration
1.01
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

BIM Model Autocorrection Algorithm Based on Work Breakdown Structure for a Petrochemical Plant — Seung‐Hee Kim, Jong-Kyu Yun · Advances in Civil Engineering (2025) | TGRS Research Map | TGRS