Analysis of Organizational Factors and Performance in BIM Projects: Empirical Evidence from the Latin American Construction Industry

Efficient management of construction projects using BIM (Building Information Modeling) technology is essential for optimizing resources, reducing delays, and improving quality in the AEC industry. This study analyzed associations between organizational variables (work area, BIM software used, type of company, level of experience) and key performance indicators (delays, costs, satisfaction) based on a sample of 101 Latin American professionals. Both descriptive techniques and inferential tests (contingency tables, Chi-square, normality tests, Wilcoxon, ANOVA) were applied, depending on the nature of the variables. The main results showed that only the relationship between type of company and level of experience was statistically significant, with independent companies having less BIM experience than consultants and clients (Succar et al., 2022). No significant associations were found between functional area or software used and the frequency of delays or professional satisfaction, consistent with studies that identify management and training factors as key determinants (Eastman et al., 2018; Gu & London, 2010). The quantitative variables showed non-normal distributions, with strong asymmetries and the presence of outliers, reinforcing the need for non-parametric methods and a focus on problematic projects. In addition, it was found that lower levels of experience are associated with greater delays, underscoring the value of continuous training (Barbosa et al., 2017). The study argues that digital maturity and organizational experience are the most relevant factors for success in BIM projects, suggesting that training policies and programs should focus on less experienced actors and reinforce the use of robust statistics for performance monitoring in the construction industry (Chong et al., 2017; Martínez-Rojas et al., 2016).

Authors

Institutions

Publication Details

Journal
INTRA Interdisciplinary Research and Analysis Journal
Published
2025-08-15
DOI
https://doi.org/10.63948/intraj.v2i1.599
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analysis of Organizational Factors and Performance in BIM Projects: Empirical Evidence from the Latin American Construction Industry

Milton Zambrano Chalen, Evelio Cabezas, Christian Zambrano Murillo, Diego Castro Hidrovo
INTRA Interdisciplinary Research and Analysis Journal
BIM and Construction Integration
article

Analysis of Organizational Factors and Performance in BIM Projects: Empirical Evidence from the Latin American Construction Industry

Milton Zambrano Chalen, Evelio Cabezas, Christian Zambrano Murillo, Diego Castro Hidrovo
article en

Abstract

Efficient management of construction projects using BIM (Building Information Modeling) technology is essential for optimizing resources, reducing delays, and improving quality in the AEC industry. This study analyzed associations between organizational variables (work area, BIM software used, type of company, level of experience) and key performance indicators (delays, costs, satisfaction) based on a sample of 101 Latin American professionals. Both descriptive techniques and inferential tests (contingency tables, Chi-square, normality tests, Wilcoxon, ANOVA) were applied, depending on the nature of the variables. The main results showed that only the relationship between type of company and level of experience was statistically significant, with independent companies having less BIM experience than consultants and clients (Succar et al., 2022). No significant associations were found between functional area or software used and the frequency of delays or professional satisfaction, consistent with studies that identify management and training factors as key determinants (Eastman et al., 2018; Gu & London, 2010). The quantitative variables showed non-normal distributions, with strong asymmetries and the presence of outliers, reinforcing the need for non-parametric methods and a focus on problematic projects. In addition, it was found that lower levels of experience are associated with greater delays, underscoring the value of continuous training (Barbosa et al., 2017). The study argues that digital maturity and organizational experience are the most relevant factors for success in BIM projects, suggesting that training policies and programs should focus on less experienced actors and reinforce the use of robust statistics for performance monitoring in the construction industry (Chong et al., 2017; Martínez-Rojas et al., 2016).

INTRA Interdisciplinary Research and Analysis JournalVol. 2(1)
Universidad Laica Vicente Rocafuerte de Guayaquil (EC), Universidad Bolivariana del Ecuador
Openalex Percentile: Top 73%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.