Development of Filter Pond Cleaning Process Using Experimental Design

The cleaning process of filter ponds is crucial for maintaining water quality and ensuring the effective operation of aquaculture systems and wastewater treatment facilities. This research outlines a systematic approach to optimizing the filter pond cleaning process using Design of Experiments methodology. Two factors including blower activation time and washing time are considered and the response is Turbidity value. To ensure that the turbidity value is less than the acceptable level, the turbidity target is set as 0.7. Based on the experiment and analysis, the blower activation time and washing time should be set as 1 and 7 minutes, respectively. The after-implementation result shows that the turbidity value are 0.531-0.671 NTU, which is less than 0.8. After calculating the savings, by setting the blower time and washing time, the electricity is reduced by 11,139.18 baht per month, which is 26.46 percent.

Authors

Institutions

Publication Details

Published
2025-05-22
DOI
https://doi.org/10.1109/icbir65229.2025.11163239
Primary Topic
Innovations in Concrete and Construction Materials
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Development of Filter Pond Cleaning Process Using Experimental Design

Jirarat Teeravaraprug, Tarathorn Podcharathitikull, Arin Aonbuth, Thada Sarakool
Innovations in Concrete and Construction Materials
article

Development of Filter Pond Cleaning Process Using Experimental Design

Jirarat Teeravaraprug, Tarathorn Podcharathitikull, Arin Aonbuth, Thada Sarakool
article en

Abstract

The cleaning process of filter ponds is crucial for maintaining water quality and ensuring the effective operation of aquaculture systems and wastewater treatment facilities. This research outlines a systematic approach to optimizing the filter pond cleaning process using Design of Experiments methodology. Two factors including blower activation time and washing time are considered and the response is Turbidity value. To ensure that the turbidity value is less than the acceptable level, the turbidity target is set as 0.7. Based on the experiment and analysis, the blower activation time and washing time should be set as 1 and 7 minutes, respectively. The after-implementation result shows that the turbidity value are 0.531-0.671 NTU, which is less than 0.8. After calculating the savings, by setting the blower time and washing time, the electricity is reduced by 11,139.18 baht per month, which is 26.46 percent.

Thammasat University (TH), King Mongkut's University of Technology North Bangkok (TH)
Openalex Percentile: Top 73%
Innovations in Concrete and Construction Materials
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.