Multi-Product Production Scheduling with Limited Warehouse Space: a Four-Step Approach
The research considers a production scheduling problem for the system where multiple products are produced on a single production line on a rotating basis. All finished products are stored in the same limited-capacity warehouse. With a storage space restriction, the scheduling objective is to minimize the total variable cost, which includes production setup and inventory holding costs. The four-step approach is presented to determine the proper production run size and the production schedule for each run. A numerical experiment on 180 randomly generated problems is conducted to evaluate the performance of the proposed method. The result indicates that the four-step approach can reduce the total variable cost by approximately 10.74% compared to a traditional solution. The difference is more emphasized when the slack time ratio is increased.
Authors
- Wisut Supithak (ORCID: https://orcid.org/0000-0003-0205-9607)
- Titirat Vivithkeyoonvong (ORCID: https://orcid.org/0000-0003-0752-5785)
Institutions
- Kasetsart University (TH)
Publication Details
- Published
- 2025-05-22
- DOI
- https://doi.org/10.1109/icbir65229.2025.11163382
- Primary Topic
- Scheduling and Optimization Algorithms
- Type
- article
- Field-Weighted Citation Impact
- 0.00