Flexible workshop problem solving based on improved NSGA-II algorithm

Aiming at the problems of multi-objective conflict and uneven resource utilization in flexible manufacturing workshop scheduling, a multi-objective optimization scheduling model is established, which comprehensively takes into account the key indexes such as workshop completion time, energy consumption, delay time and equipment load. In the process of model construction, the mutual influences and constraints among the objectives are fully revealed through the in-depth analysis of the performance indicators in the actual production environment. In order to effectively solve the scheduling model, this paper improves the traditional NSGA-II algorithm by incorporating the greedy algorithm for the fast search of local optimal solutions, which greatly improves the convergence speed and the quality of the algorithm. Meanwhile, the proposed novel solution strategy achieves a good balance between the global search capability of the algorithm and the local fine optimization, and finally the effectiveness of the model is verified by numerical experiments and simulation analysis.

Authors

Institutions

Publication Details

Published
2025-09-16
DOI
https://doi.org/10.1117/12.3076765
Primary Topic
Manufacturing Process and Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Flexible workshop problem solving based on improved NSGA-II algorithm

Wen‐Long Lei, Guoqiang Li, Wu Wang, Xiaowen Xu et al.
Manufacturing Process and Optimization
article

Flexible workshop problem solving based on improved NSGA-II algorithm

Wen‐Long Lei, Guoqiang Li, Wu Wang, Xiaowen Xu, Yu Sun, Xueguang Li, Huaidan Liang
article en

Abstract

Aiming at the problems of multi-objective conflict and uneven resource utilization in flexible manufacturing workshop scheduling, a multi-objective optimization scheduling model is established, which comprehensively takes into account the key indexes such as workshop completion time, energy consumption, delay time and equipment load. In the process of model construction, the mutual influences and constraints among the objectives are fully revealed through the in-depth analysis of the performance indicators in the actual production environment. In order to effectively solve the scheduling model, this paper improves the traditional NSGA-II algorithm by incorporating the greedy algorithm for the fast search of local optimal solutions, which greatly improves the convergence speed and the quality of the algorithm. Meanwhile, the proposed novel solution strategy achieves a good balance between the global search capability of the algorithm and the local fine optimization, and finally the effectiveness of the model is verified by numerical experiments and simulation analysis.

Changchun University of Science and Technology (CN), China North Industries Group Corporation (China) (CN), Institute of Navigation (US)
Openalex Percentile: Top 65%
Manufacturing Process and Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Flexible workshop problem solving based on improved NSGA-II algorithm — Wen‐Long Lei, Guoqiang Li, et al. · (2025) | TGRS Research Map | TGRS