Perbandingan Waktu Proses Perencanaan Gedung Bertingkat Antara Menggunakan Dynamo dan Metode Konvensional pada Revit

Building Information Modeling (BIM) is a computer-based technology that facilitates planning activities across various disciplines, including structural, architectural, and mechanical–electrical works. The implementation of BIM in construction projects requires a high level of accuracy to ensure cost efficiency and smooth workflow. This study aims to examine the time differences in material calculation processes using two different methods: the conventional Material Take-Off feature in Autodesk Revit and a custom plug-in developed using Dynamo. The study employs a 3D model of a three-story building as the test object. Work duration was measured using a stopwatch at the beginning of each calculation process to obtain more precise time records. The results indicate that the use of Dynamo significantly accelerates the calculation process, achieving a fivefold speed improvement compared to the conventional Material Take-Off method. Furthermore, the developed Dynamo script can be applied to projects of the same type but with different geometric forms. Therefore, the proposed script is expected to serve as a practical solution for enhancing accuracy and productivity in concrete work planning for BIM-based construction projects.

Authors

Institutions

Publication Details

Journal
Cantilever Jurnal Penelitian dan Kajian Bidang Teknik Sipil
Published
2025-09-08
DOI
https://doi.org/10.35139/cantilever.v14i2.452
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Perbandingan Waktu Proses Perencanaan Gedung Bertingkat Antara Menggunakan Dynamo dan Metode Konvensional pada Revit

Akhmad Aminullah, Yoga Kencana, Toriq Arif Ghuzdewa
Cantilever Jurnal Penelitian dan Kajian Bidang Teknik Sipil
BIM and Construction Integration
article

Perbandingan Waktu Proses Perencanaan Gedung Bertingkat Antara Menggunakan Dynamo dan Metode Konvensional pada Revit

Akhmad Aminullah, Yoga Kencana, Toriq Arif Ghuzdewa
article en

Abstract

Building Information Modeling (BIM) is a computer-based technology that facilitates planning activities across various disciplines, including structural, architectural, and mechanical–electrical works. The implementation of BIM in construction projects requires a high level of accuracy to ensure cost efficiency and smooth workflow. This study aims to examine the time differences in material calculation processes using two different methods: the conventional Material Take-Off feature in Autodesk Revit and a custom plug-in developed using Dynamo. The study employs a 3D model of a three-story building as the test object. Work duration was measured using a stopwatch at the beginning of each calculation process to obtain more precise time records. The results indicate that the use of Dynamo significantly accelerates the calculation process, achieving a fivefold speed improvement compared to the conventional Material Take-Off method. Furthermore, the developed Dynamo script can be applied to projects of the same type but with different geometric forms. Therefore, the proposed script is expected to serve as a practical solution for enhancing accuracy and productivity in concrete work planning for BIM-based construction projects.

Cantilever Jurnal Penelitian dan Kajian Bidang Teknik SipilVol. 14(2)
Universitas Gadjah Mada (ID)
Openalex Percentile: Top 73%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.