Analysis of Project Implementation Costs Using the Crashing Method in The Improvement of The Andongrejo-Bandialet Road, Jember District

Construction project control is a systematic process aimed at ensuring that project objectives align with planning standards. One method used to accelerate project duration is "crashing," which involves reducing the time of specific activities that affect project completion, focusing particularly on activities on the critical path. This research adopts a descriptive method to collect and analyze data on the status of current symptoms related to project time management. Data collection was conducted through documentation, utilizing records, images, and work outputs. The results show that total project costs decrease significantly as the level of time compression (reduction of project duration) increases. However, increasing labor costs exhibits a small but consistent rise, indicating lower cost efficiency. The most optimal project costs were observed when additional working time was utilized, as opposed to adding more labor. In conclusion, while the crashing method is effective for reducing the risk of fines and indirect costs, selecting the best alternative requires balancing productivity and marginal costs (cost-time trade-off). For similar projects, extending working hours proves more cost-effective than increasing workforce size.

Authors

Institutions

Publication Details

Journal
Enrichment Journal of Multidisciplinary Research and Development
Published
2025-08-29
DOI
https://doi.org/10.55324/enrichment.v3i5.477
Primary Topic
Occupational Health and Safety Management
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analysis of Project Implementation Costs Using the Crashing Method in The Improvement of The Andongrejo-Bandialet Road, Jember District

Esti Wulandari, Budi Witjaksana, Lukman Ardianto
Enrichment Journal of Multidisciplinary Research and Development
Occupational Health and Safety Management
article

Analysis of Project Implementation Costs Using the Crashing Method in The Improvement of The Andongrejo-Bandialet Road, Jember District

Esti Wulandari, Budi Witjaksana, Lukman Ardianto
article en

Abstract

Construction project control is a systematic process aimed at ensuring that project objectives align with planning standards. One method used to accelerate project duration is "crashing," which involves reducing the time of specific activities that affect project completion, focusing particularly on activities on the critical path. This research adopts a descriptive method to collect and analyze data on the status of current symptoms related to project time management. Data collection was conducted through documentation, utilizing records, images, and work outputs. The results show that total project costs decrease significantly as the level of time compression (reduction of project duration) increases. However, increasing labor costs exhibits a small but consistent rise, indicating lower cost efficiency. The most optimal project costs were observed when additional working time was utilized, as opposed to adding more labor. In conclusion, while the crashing method is effective for reducing the risk of fines and indirect costs, selecting the best alternative requires balancing productivity and marginal costs (cost-time trade-off). For similar projects, extending working hours proves more cost-effective than increasing workforce size.

Enrichment Journal of Multidisciplinary Research and DevelopmentVol. 3(5)
Universitas 17 Agustus 1945 Surabaya (ID)
Openalex Percentile: Top 64%
Occupational Health and Safety Management
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.