EXCITATION SYSTEMS FOR MOTOR-GENERATORS IN THE BAJINA BAŠTA PUMPED-STORAGE HYDROPOWER PLANT

The run-of-river hydropower plant HPP „Bajina Bašta“ and the pumped-storage hydropower plant PSH „Bajina Bašta“ in Perućac are the largest hydropower facilities built on the Drina River. PSH „Bajina Bašta“ is of great importance to Serbia’s power system due to its ability to operate in both generating and pumping modes, thereby increasing the system’s flexibility in terms of managing production and consumption. Periods of lower electricity consumption are used to fill the upper reservoir by operating the plant in pumping mode. When the system requires additional energy, the units switch to the opposite mode, and the release of water from the higher-altitude reservoir drives the turbines, generating electricity. Also, due to its ability to start quickly and rapidly switch between generating and pumping modes, this plant can quickly respond to system disturbances and replace any other unit in the electrical power system of Serbia. Therefore, the revitalization of PSH „Bajina Bašta,“ which is expected to extend the lifespan of the units by several decades, is of great importance to the power system. In 2024, the first unit was revitalized, while the revitalization of the second unit is scheduled for 2025. Nikola Tesla Institute of Electrical Engineering participated in the revitalization by replacing the excitation systems. The power section of the excitation system includes high-performance components: excitation transformers, circuit breakers, thyristor bridges, demagnetization equipment, etc. The control section of the excitation system is based on certified INTROL excitation regulators developed and manufactured at the Nikola Tesla Institute. Within the regulators, sequential automatons are implemented for all operating modes of the units: generating mode, pumping mode, synchronous start, electric braking, and testing. INTROL regulators enable various control modes: automatic stator voltage regulation, automatic reactive power regulation, and automatic power factor regulation, along with limiter functions and a power system stabilizer. The thyristor bridges and excitation regulators are implemented redundantly in a 1+1 configuration. After installation and connection, the excitation system was adjusted and tested, demonstrating good system performance, enabling reliable and stable unit operation in all operating modes, with automatic operation limitation within the boundaries defined by the operating diagram.

Authors

Publication Details

Published
2025-01-01
DOI
https://doi.org/10.46793/cigre37.a1.08
Primary Topic
Cavitation Phenomena in Pumps
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

EXCITATION SYSTEMS FOR MOTOR-GENERATORS IN THE BAJINA BAŠTA PUMPED-STORAGE HYDROPOWER PLANT

Nemanja Milojčić, D. Trišić, Zoran Ćirić, Matija Pavičević et al.
Cavitation Phenomena in Pumps
article

EXCITATION SYSTEMS FOR MOTOR-GENERATORS IN THE BAJINA BAŠTA PUMPED-STORAGE HYDROPOWER PLANT

Nemanja Milojčić, D. Trišić, Zoran Ćirić, Matija Pavičević, Slavko Veinović, Djordje Stojić, Dušan Joksimović, Luka Ivanović, Ilija Klasnić
article en

Abstract

The run-of-river hydropower plant HPP „Bajina Bašta“ and the pumped-storage hydropower plant PSH „Bajina Bašta“ in Perućac are the largest hydropower facilities built on the Drina River. PSH „Bajina Bašta“ is of great importance to Serbia’s power system due to its ability to operate in both generating and pumping modes, thereby increasing the system’s flexibility in terms of managing production and consumption. Periods of lower electricity consumption are used to fill the upper reservoir by operating the plant in pumping mode. When the system requires additional energy, the units switch to the opposite mode, and the release of water from the higher-altitude reservoir drives the turbines, generating electricity. Also, due to its ability to start quickly and rapidly switch between generating and pumping modes, this plant can quickly respond to system disturbances and replace any other unit in the electrical power system of Serbia. Therefore, the revitalization of PSH „Bajina Bašta,“ which is expected to extend the lifespan of the units by several decades, is of great importance to the power system. In 2024, the first unit was revitalized, while the revitalization of the second unit is scheduled for 2025. Nikola Tesla Institute of Electrical Engineering participated in the revitalization by replacing the excitation systems. The power section of the excitation system includes high-performance components: excitation transformers, circuit breakers, thyristor bridges, demagnetization equipment, etc. The control section of the excitation system is based on certified INTROL excitation regulators developed and manufactured at the Nikola Tesla Institute. Within the regulators, sequential automatons are implemented for all operating modes of the units: generating mode, pumping mode, synchronous start, electric braking, and testing. INTROL regulators enable various control modes: automatic stator voltage regulation, automatic reactive power regulation, and automatic power factor regulation, along with limiter functions and a power system stabilizer. The thyristor bridges and excitation regulators are implemented redundantly in a 1+1 configuration. After installation and connection, the excitation system was adjusted and tested, demonstrating good system performance, enabling reliable and stable unit operation in all operating modes, with automatic operation limitation within the boundaries defined by the operating diagram.

Openalex Percentile: Top 72%
Cavitation Phenomena in Pumps
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.