NEW 412/350 MVA/MW POWER TURBOGENERATOR IN BLOCK B3 TE "KOSTOLAC B"

Synchronous turbogenerators, in addition to being important in the production of electricity, are also important from the aspect of the inertia of the frequency change in the power system. In modern systems, where there is an increasing share of renewable energy sources without inertia (wind turbines and solar panels connected to the system using inverters), the role of synchronous generators in providing the inertia of rotating masses becomes even more important from the aspect of system stability. The paper provides an overview of the basic technical parameters and characteristics of the new turbogenerator B3 in TPP „Kostolac B“, rated power 412/350 (MVA/MW), which was first synchronized to the Serbian power system on January 26th, 2024. Trial run of 168 hours was successfully completed on October 15th, 2024. and the Unit was handed over to EPS AD on 03.12.2025. by signing the TOC (taking over certificate). The specifics of the construction of the generator are described, especially the construction of stator end windings and the modern checking of the dimensions of the ends of the bars used in high power generators for nuclear power plants. Technological schemes of the system for: gas installation for hydrogen cooling and demi-water cooling station for the stator windings are presented. A list of implemented generator electrical protections is given, as well as a description of the generator excitation system and temperature monitoring.

Authors

Publication Details

Published
2025-01-01
DOI
https://doi.org/10.46793/cigre37.a1.01
Primary Topic
Oil and Gas Production Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

NEW 412/350 MVA/MW POWER TURBOGENERATOR IN BLOCK B3 TE "KOSTOLAC B"

Zoran Božović, Zoran Ćirić, Denis Ilić, Diana Franulić Šarić et al.
Oil and Gas Production Techniques
article

NEW 412/350 MVA/MW POWER TURBOGENERATOR IN BLOCK B3 TE "KOSTOLAC B"

Zoran Božović, Zoran Ćirić, Denis Ilić, Diana Franulić Šarić, Đorđe Jovanović, Ilija Klasnić, Željko Lazović
article en

Abstract

Synchronous turbogenerators, in addition to being important in the production of electricity, are also important from the aspect of the inertia of the frequency change in the power system. In modern systems, where there is an increasing share of renewable energy sources without inertia (wind turbines and solar panels connected to the system using inverters), the role of synchronous generators in providing the inertia of rotating masses becomes even more important from the aspect of system stability. The paper provides an overview of the basic technical parameters and characteristics of the new turbogenerator B3 in TPP „Kostolac B“, rated power 412/350 (MVA/MW), which was first synchronized to the Serbian power system on January 26th, 2024. Trial run of 168 hours was successfully completed on October 15th, 2024. and the Unit was handed over to EPS AD on 03.12.2025. by signing the TOC (taking over certificate). The specifics of the construction of the generator are described, especially the construction of stator end windings and the modern checking of the dimensions of the ends of the bars used in high power generators for nuclear power plants. Technological schemes of the system for: gas installation for hydrogen cooling and demi-water cooling station for the stator windings are presented. A list of implemented generator electrical protections is given, as well as a description of the generator excitation system and temperature monitoring.

Openalex Percentile: Top 69%
Oil and Gas Production Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

NEW 412/350 MVA/MW POWER TURBOGENERATOR IN BLOCK B3 TE "KOSTOLAC B" — Zoran Božović, Zoran Ćirić, et al. · (2025) | TGRS Research Map | TGRS