Research on Construction Period Optimization of High-Rise Buildings Based on Integrated Building Platform Applications
This study optimizes high-rise residential construction schedules using Integrated Building Platforms and genetic algorithms. By analyzing process sequences and overlapping relationships, a schedule optimization model is developed to overcome inefficiencies in traditional sequential methods. The model leverages multi-layer collaboration, enabling parallel and interwoven processes while considering overlapping logic and time constraints. Validated with a real case, the model reduced standard-floor construction from 6 to 4 days (33.3% efficiency gain) and cut idle time by 41%. The approach breaks traditional limitations, maximizing platform advantages for improved resource allocation and process management. The research offers a scientific, efficient scheduling solution for high-rise construction, demonstrating significant theoretical and practical value. It presents a novel optimization method for the building industry.
Authors
- Chenxi Hu
- Qingqing Wu (ORCID: https://orcid.org/0000-0002-0043-3266)
- Shuqiang Wang (ORCID: https://orcid.org/0000-0002-5098-7080)
Institutions
- Hubei University of Technology (CN)
Publication Details
- Journal
- Buildings
- Published
- 2025-09-15
- DOI
- https://doi.org/10.3390/buildings15183338
- Citations
- 2
- Primary Topic
- Resource-Constrained Project Scheduling
- Type
- article
- Field-Weighted Citation Impact
- 4.21