Research on Mirror Closed Loop Testing Technology for Substation Control System Retrofit

Aiming at the problems of difficult outage approval for substation control system retrofits, short outage commissioning acceptance time, slow manual acceptance, and incomplete information verification, this paper proposes a mirror closed-loop testing system for substation control system retrofits. This system constructs mirror systems for equipment in operation, adopts horizontal mirror comparison and vertical closed-loop verification mechanisms, completes automatic testing of substation control system retrofits with a modular functional approach, and can automatically generate standardized test result reports. The designed mirror closed-loop testing system can move the manual verification process to the testing system for efficient execution, effectively shorten on-site outage time, eliminate verification risks in advance, and improve substation retrofit efficiency and quality.

Authors

Institutions

Publication Details

Published
2025-06-20
DOI
https://doi.org/10.1109/icesep66633.2025.11155558
Primary Topic
Smart Grid and Power Systems
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Research on Mirror Closed Loop Testing Technology for Substation Control System Retrofit

Xiaoming You, Yue Yang, Meiqiang Yang, Xiaofei Zhou et al.
Smart Grid and Power Systems
article

Research on Mirror Closed Loop Testing Technology for Substation Control System Retrofit

Xiaoming You, Yue Yang, Meiqiang Yang, Xiaofei Zhou, Xingtao Zhuang
article en

Abstract

Aiming at the problems of difficult outage approval for substation control system retrofits, short outage commissioning acceptance time, slow manual acceptance, and incomplete information verification, this paper proposes a mirror closed-loop testing system for substation control system retrofits. This system constructs mirror systems for equipment in operation, adopts horizontal mirror comparison and vertical closed-loop verification mechanisms, completes automatic testing of substation control system retrofits with a modular functional approach, and can automatically generate standardized test result reports. The designed mirror closed-loop testing system can move the manual verification process to the testing system for efficient execution, effectively shorten on-site outage time, eliminate verification risks in advance, and improve substation retrofit efficiency and quality.

China Electric Equipment Group (China) (CN)
Openalex Percentile: Top 76%
Smart Grid and Power Systems
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Research on Mirror Closed Loop Testing Technology for Substation Control System Retrofit — Xiaoming You, Yue Yang, et al. · (2025) | TGRS Research Map | TGRS