Research on Safety Risk Management of Substation Switching Operations Based on Information Fusion

Substation switching operations are characterized by high frequency and elevated risk levels. Traditional safety prevention methods, which mainly rely on rule-based systems and manual review, often struggle with delayed responses and limited accuracy in complex scenarios. This study proposes a risk identification and early warning method for switching operations based on multi-source information fusion. By integrating multidimensional data such as operation logs, video surveillance, equipment status, and environmental variables, a unified graph structure is constructed. A graph neural network (GNN) combined with a self-attention mechanism is used to extract key risk factors and temporal dependency features. Additionally, a fuzzy analytic hierarchy process (FAHP) is introduced to build a multidimensional risk assessment model, enabling quantitative scoring and hierarchical response to operational risks. Experimental validation on a hardware-in-the-loop simulation platform shows that the proposed method achieves a 91% risk identification accuracy across 300 sample sets, with an average response time of 0.32 seconds, significantly enhancing the intelligent early warning capability and overall safety of switching operations.

Authors

Institutions

Publication Details

Published
2025-06-20
DOI
https://doi.org/10.1109/icesep66633.2025.11155638
Primary Topic
Evaluation and Optimization Models
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Research on Safety Risk Management of Substation Switching Operations Based on Information Fusion

Yuxiao Zhang, Junjie Zhang, Yuzhu Wu, Y. Luo et al.
Evaluation and Optimization Models
article

Research on Safety Risk Management of Substation Switching Operations Based on Information Fusion

Yuxiao Zhang, Junjie Zhang, Yuzhu Wu, Y. Luo, Yi Zheng
article en

Abstract

Substation switching operations are characterized by high frequency and elevated risk levels. Traditional safety prevention methods, which mainly rely on rule-based systems and manual review, often struggle with delayed responses and limited accuracy in complex scenarios. This study proposes a risk identification and early warning method for switching operations based on multi-source information fusion. By integrating multidimensional data such as operation logs, video surveillance, equipment status, and environmental variables, a unified graph structure is constructed. A graph neural network (GNN) combined with a self-attention mechanism is used to extract key risk factors and temporal dependency features. Additionally, a fuzzy analytic hierarchy process (FAHP) is introduced to build a multidimensional risk assessment model, enabling quantitative scoring and hierarchical response to operational risks. Experimental validation on a hardware-in-the-loop simulation platform shows that the proposed method achieves a 91% risk identification accuracy across 300 sample sets, with an average response time of 0.32 seconds, significantly enhancing the intelligent early warning capability and overall safety of switching operations.

Tongren University (CN), Liupanshui Normal University (CN), Guizhou Electric Power Design and Research Institute (CN), Power Grid Corporation (India) (IN)
Openalex Percentile: Top 70%
Evaluation and Optimization Models
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Research on Safety Risk Management of Substation Switching Operations Based on Information Fusion — Yuxiao Zhang, Junjie Zhang, et al. · (2025) | TGRS Research Map | TGRS