Leading the MENA Energy Industry in Deploying a Combination Bismuth Alloy & Cement Barrier in Offshore P&A Applications for Permanent P&A Integrity

This paper will explain the P&A strategy that was safely and successfully executed using a combination of a bismuth alloy barrier along with conventional cement plugs in two of the wells, which had sustained annulus pressures. This strategy was adopted with the aim of maximizing P&A integrity, using a V0-rated bismuth plug to reduce the length of dual casing section milling. The P&A designs for the project were compiled to align with the technical standards of UK Oil + Gas Well Decommissioning Guidelines (Issue 6 January 2018), and bismuth alloy technology has been an approved abandonment barrier under Oil and Gas. The P&A project was the first deployment in the Arabian Gulf & Middle East North Africa Region using bismuth alloy technology as an integral part of the 2-barrier system with the STC (Seal Through Casing) in single and dual section milled windows, hence building upon the track record of over 200 STC P&A barriers worldwide (status Jan 2024). In this context, the operator has demonstrated a clear technology leadership position and created a very valuable learning curve for the MENA future gas well P&A domain.

Authors

Publication Details

Journal
Engineering Advances
Published
2025-05-14
DOI
https://doi.org/10.26855/ea.2025.04.002
Primary Topic
Metallurgical Processes and Thermodynamics
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Leading the MENA Energy Industry in Deploying a Combination Bismuth Alloy & Cement Barrier in Offshore P&A Applications for Permanent P&A Integrity

Alan W. Reid, S. K. Ghandi, Yuejun Liu, Hongsheng Li et al.
Engineering Advances
Metallurgical Processes and Thermodynamics
article

Leading the MENA Energy Industry in Deploying a Combination Bismuth Alloy & Cement Barrier in Offshore P&A Applications for Permanent P&A Integrity

Alan W. Reid, S. K. Ghandi, Yuejun Liu, Hongsheng Li, Zhenguo Zheng, Chris Kuijken, Patrick Boyce
article en

Abstract

This paper will explain the P&A strategy that was safely and successfully executed using a combination of a bismuth alloy barrier along with conventional cement plugs in two of the wells, which had sustained annulus pressures. This strategy was adopted with the aim of maximizing P&A integrity, using a V0-rated bismuth plug to reduce the length of dual casing section milling. The P&A designs for the project were compiled to align with the technical standards of UK Oil + Gas Well Decommissioning Guidelines (Issue 6 January 2018), and bismuth alloy technology has been an approved abandonment barrier under Oil and Gas. The P&A project was the first deployment in the Arabian Gulf & Middle East North Africa Region using bismuth alloy technology as an integral part of the 2-barrier system with the STC (Seal Through Casing) in single and dual section milled windows, hence building upon the track record of over 200 STC P&A barriers worldwide (status Jan 2024). In this context, the operator has demonstrated a clear technology leadership position and created a very valuable learning curve for the MENA future gas well P&A domain.

Engineering AdvancesVol. 5(2)
Openalex Percentile: Top 75%
Metallurgical Processes and Thermodynamics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.