A New Mixed-Integer Linear Programming Model for Ultimate Pit Limit Determination and Production Planning of Open Pit Mines Considering Effective Operational Constraints

Strategic mine planning is essential for attracting investment and ensuring efficient resource utilization. Long-term production scheduling determines the sequence of ore and waste block extraction to maximize economic returns while satisfying operational constraints. In addition to estimating the Net Present Value (NPV), it provides a foundation for medium- and short-term planning.This study presents a Mixed-Integer Linear Programming (MILP) model for determining the ultimate pit limit and performing long-term production scheduling under two scenarios: with and without the use of a stockpile. The model aims to maximize project NPV while incorporating seven key constraints—four geometric (block precedence, pit floor width, block extraction continuity, and non-repetition of block selection) and three demand-based (extraction capacity, ore block requirement, and minimum feed grade per period). The model was implemented in GAMS and tested on a hypothetical 5×7 block dataset to evaluate its feasibility and performance. Sensitivity analysis showed that increasing the pit floor width from one to four blocks resulted in a 44.8% reduction in the objective function value. A demand sensitivity analysis (1–3 blocks per period) under the non-stockpile scenario revealed that a 3-block demand was infeasible, while the best result was achieved at 1 block. To address infeasibility, stockpile inventory and shortage variables were introduced. The updated model identified 2 blocks per period as the optimal plant capacity, balancing stockpile holding costs and shortage penalties. If demand exceeds production, a penalty is applied to the objective function; if production exceeds demand, the surplus is added to the stockpile for future use. This mechanism enhances scheduling flexibility and supports more robust decision-making under real-world constraints.

Authors

Institutions

Publication Details

Journal
International Journal of Engineering
Published
2025-09-09
DOI
https://doi.org/10.5829/ije.2026.39.07a.02
Primary Topic
Mining Techniques and Economics
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A New Mixed-Integer Linear Programming Model for Ultimate Pit Limit Determination and Production Planning of Open Pit Mines Considering Effective Operational Constraints

Sajjad Afraei, M. M. Hajiabedi
International Journal of Engineering
Mining Techniques and Economics
article

A New Mixed-Integer Linear Programming Model for Ultimate Pit Limit Determination and Production Planning of Open Pit Mines Considering Effective Operational Constraints

Sajjad Afraei, M. M. Hajiabedi
article en

Abstract

Strategic mine planning is essential for attracting investment and ensuring efficient resource utilization. Long-term production scheduling determines the sequence of ore and waste block extraction to maximize economic returns while satisfying operational constraints. In addition to estimating the Net Present Value (NPV), it provides a foundation for medium- and short-term planning.This study presents a Mixed-Integer Linear Programming (MILP) model for determining the ultimate pit limit and performing long-term production scheduling under two scenarios: with and without the use of a stockpile. The model aims to maximize project NPV while incorporating seven key constraints—four geometric (block precedence, pit floor width, block extraction continuity, and non-repetition of block selection) and three demand-based (extraction capacity, ore block requirement, and minimum feed grade per period). The model was implemented in GAMS and tested on a hypothetical 5×7 block dataset to evaluate its feasibility and performance. Sensitivity analysis showed that increasing the pit floor width from one to four blocks resulted in a 44.8% reduction in the objective function value. A demand sensitivity analysis (1–3 blocks per period) under the non-stockpile scenario revealed that a 3-block demand was infeasible, while the best result was achieved at 1 block. To address infeasibility, stockpile inventory and shortage variables were introduced. The updated model identified 2 blocks per period as the optimal plant capacity, balancing stockpile holding costs and shortage penalties. If demand exceeds production, a penalty is applied to the objective function; if production exceeds demand, the surplus is added to the stockpile for future use. This mechanism enhances scheduling flexibility and supports more robust decision-making under real-world constraints.

International Journal of EngineeringVol. 39(7)
Amirkabir University of Technology (IR)
Openalex Percentile: Top 69%
Mining Techniques and Economics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.