Risk Analysis of Project Financing and Optimization of Engineering Construction Financing Based on Fuzzy Comprehensive Evaluation

AbstractThis study focuses on the application of fuzzy comprehensive evaluation in project financing risk analysis and engineering construction financing optimization, using large-scale highway projects as empirical evidence to construct a risk management framework.With the expansion of large-scale project investment scale, project financing has become the core means due to its characteristic of using future cash flow as the repayment source.However, its long cycle, large scale, and multiple participants lead to complex financing risks, and traditional qualitative methods are difficult to meet scientific decision-making needs.Combining literature review and case analysis, using Analytic Hierarchy Process (AHP) and Fuzzy Comprehensive Evaluation (FCE) to construct a multi-level risk assessment system consisting of 2 first level, 8 second level, and 30 third level indicators, quantifying risk levels through expert scoring, identifying external (policy, market) and internal (funding, technology) risks, and proposing targeted response strategies.Result: Land acquisition and demolition, construction safety, etc. are relatively high risks, while policy adjustments and interest rate changes are general risks; Three dimensional strategy optimizes fund allocation, enhances fund flow stability, reduces financing default risk, and achieves multi-party benefit coordination among project management, investors, and government departments.Enriched the quantitative analysis methods for risk management in large-scale engineering project financing, providing a replicable practical path for optimizing engineering construction financing.In the future, it is necessary to optimize the indicator system in combination with the new situation, explore more scientific evaluation models, and further verify some viewpoints.

Publication Details

Journal
International Journal of Business Management and Economics and Trade
Published
2025-09-08
DOI
https://doi.org/10.38007/ijbmet.2025.060111
Primary Topic
Evaluation and Optimization Models
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Risk Analysis of Project Financing and Optimization of Engineering Construction Financing Based on Fuzzy Comprehensive Evaluation

International Journal of Business Management and Economics and Trade
Evaluation and Optimization Models
article

Risk Analysis of Project Financing and Optimization of Engineering Construction Financing Based on Fuzzy Comprehensive Evaluation

article en

Abstract

AbstractThis study focuses on the application of fuzzy comprehensive evaluation in project financing risk analysis and engineering construction financing optimization, using large-scale highway projects as empirical evidence to construct a risk management framework.With the expansion of large-scale project investment scale, project financing has become the core means due to its characteristic of using future cash flow as the repayment source.However, its long cycle, large scale, and multiple participants lead to complex financing risks, and traditional qualitative methods are difficult to meet scientific decision-making needs.Combining literature review and case analysis, using Analytic Hierarchy Process (AHP) and Fuzzy Comprehensive Evaluation (FCE) to construct a multi-level risk assessment system consisting of 2 first level, 8 second level, and 30 third level indicators, quantifying risk levels through expert scoring, identifying external (policy, market) and internal (funding, technology) risks, and proposing targeted response strategies.Result: Land acquisition and demolition, construction safety, etc. are relatively high risks, while policy adjustments and interest rate changes are general risks; Three dimensional strategy optimizes fund allocation, enhances fund flow stability, reduces financing default risk, and achieves multi-party benefit coordination among project management, investors, and government departments.Enriched the quantitative analysis methods for risk management in large-scale engineering project financing, providing a replicable practical path for optimizing engineering construction financing.In the future, it is necessary to optimize the indicator system in combination with the new situation, explore more scientific evaluation models, and further verify some viewpoints.

International Journal of Business Management and Economics and TradeVol. 6(1)
Openalex Percentile: Top 70%
Evaluation and Optimization Models
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.