Analyzing Construction Risk Factors in Large-Scale Projects: Case Study on the Suramadu Bridge

This study aims to comprehensively examine the risk management practices, challenges, and strategies employed during the construction of the Suramadu Bridge. A structured data collection process began with defining clear objectives to identify risks related to structural integrity, environmental impacts, financial uncertainties, project delays, and safety concerns. Key search terms such as "Suramadu Bridge construction," "risk management in bridge construction," and "construction risk assessment" guided searches across reputable online databases like Google Scholar, IEEE Xplore, ScienceDirect, the ASCE Library, JSTOR, and SpringerLink. Articles were selected based on relevance, credibility, publication date, and analytical depth. Data from these articles were extracted and organized, documenting metadata, key points, risk types, and mitigation strategies. The synthesized data revealed common themes and unique insights into the risk management practices during the Suramadu Bridge construction. The discussion delved into these themes, comparing and contrasting different risk management strategies from the literature. Key findings included effective mitigation strategies for financial and environmental risks, the importance of early risk assessment, and the role of continuous monitoring. Challenges in managing these risks were analyzed, showing how they were overcome or mitigated. The report concluded with recommendations for future infrastructure projects, emphasizing a systematic and proactive approach to risk management. Utilizing tools such as Zotero for reference management, Excel for data organization, and Microsoft Word for report compilation ensured efficiency and accuracy. This approach provided valuable insights into risk management for large infrastructure projects, offering a robust foundation for future research and practice.

Authors

Institutions

Publication Details

Journal
Leader Civil Engineering and Architecture Journal
Published
2024-12-30
DOI
https://doi.org/10.37253/leader.v2i6.10376
Citations
1
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.49
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analyzing Construction Risk Factors in Large-Scale Projects: Case Study on the Suramadu Bridge

Indrastuti Indrastuti, Reinaldy Jastino
1 citations
Leader Civil Engineering and Architecture Journal
Construction Project Management and Performance
0.49
article

Analyzing Construction Risk Factors in Large-Scale Projects: Case Study on the Suramadu Bridge

Indrastuti Indrastuti, Reinaldy Jastino
article en
1 citations

Abstract

This study aims to comprehensively examine the risk management practices, challenges, and strategies employed during the construction of the Suramadu Bridge. A structured data collection process began with defining clear objectives to identify risks related to structural integrity, environmental impacts, financial uncertainties, project delays, and safety concerns. Key search terms such as "Suramadu Bridge construction," "risk management in bridge construction," and "construction risk assessment" guided searches across reputable online databases like Google Scholar, IEEE Xplore, ScienceDirect, the ASCE Library, JSTOR, and SpringerLink. Articles were selected based on relevance, credibility, publication date, and analytical depth. Data from these articles were extracted and organized, documenting metadata, key points, risk types, and mitigation strategies. The synthesized data revealed common themes and unique insights into the risk management practices during the Suramadu Bridge construction. The discussion delved into these themes, comparing and contrasting different risk management strategies from the literature. Key findings included effective mitigation strategies for financial and environmental risks, the importance of early risk assessment, and the role of continuous monitoring. Challenges in managing these risks were analyzed, showing how they were overcome or mitigated. The report concluded with recommendations for future infrastructure projects, emphasizing a systematic and proactive approach to risk management. Utilizing tools such as Zotero for reference management, Excel for data organization, and Microsoft Word for report compilation ensured efficiency and accuracy. This approach provided valuable insights into risk management for large infrastructure projects, offering a robust foundation for future research and practice.

Leader Civil Engineering and Architecture JournalVol. 2(6)
International University of Batam (ID)
Openalex Percentile: Top 26%
Construction Project Management and Performance
0.49
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Analyzing Construction Risk Factors in Large-Scale Projects: Case Study on the Suramadu Bridge — Indrastuti Indrastuti, Reinaldy Jastino · Leader Civil Engineering and Architecture Journal (2024) | TGRS Research Map | TGRS