Evaluation of Road Geometry at the Toll Gate to Kertajati International Airport: Case Study of Kertajati Toll Gate Road

Many cities have adapted to overcome the challenges they face. Resources and weather changes are the main factors that make cities around the world intend to advance urban infrastructure in their countries. Majalengka is experiencing rapid economic growth marked by several major developments such as BIJB Airport, Kertajati toll gate, bridges, and many more. Especially the road to the Kertajati area, which has the West Java International Airport. Quick and precise planning is one of the first steps to achieve this. These findings also revealed that the excavation and embankment volumes required by the road planning requirements were 156203.72 m3 for the excavation and 36412.31 m3 for the embankment.

Authors

Institutions

Publication Details

Journal
Leader Civil Engineering and Architecture Journal
Published
2024-10-30
DOI
https://doi.org/10.37253/leader.v2i5.10330
Primary Topic
Geodetic Measurements and Engineering Structures
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Evaluation of Road Geometry at the Toll Gate to Kertajati International Airport: Case Study of Kertajati Toll Gate Road

Mulia Pamadi, Angga Pratama
Leader Civil Engineering and Architecture Journal
Geodetic Measurements and Engineering Structures
article

Evaluation of Road Geometry at the Toll Gate to Kertajati International Airport: Case Study of Kertajati Toll Gate Road

Mulia Pamadi, Angga Pratama
article en

Abstract

Many cities have adapted to overcome the challenges they face. Resources and weather changes are the main factors that make cities around the world intend to advance urban infrastructure in their countries. Majalengka is experiencing rapid economic growth marked by several major developments such as BIJB Airport, Kertajati toll gate, bridges, and many more. Especially the road to the Kertajati area, which has the West Java International Airport. Quick and precise planning is one of the first steps to achieve this. These findings also revealed that the excavation and embankment volumes required by the road planning requirements were 156203.72 m3 for the excavation and 36412.31 m3 for the embankment.

Leader Civil Engineering and Architecture JournalVol. 2(5)
Universitas Majalengka (ID), International University of Batam (ID)
Openalex Percentile: Top 66%
Geodetic Measurements and Engineering Structures
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Evaluation of Road Geometry at the Toll Gate to Kertajati International Airport: Case Study of Kertajati Toll Gate Road — Mulia Pamadi, Angga Pratama · Leader Civil Engineering and Architecture Journal (2024) | TGRS Research Map | TGRS