AUTOMATED SYSTEM FOR GEODETIC CONTROL IN BUILDING OF BRIDGE SUPERSCTRUCTURE CONSTRUCTION USING THE CANTILEVER CONCRETE OR ASSEMBLY METHOD

<p>The article presents an automated system for geodetic control in building of bridge superstructure constructions using the cantilever construction method. The system includes two modules: an observation module consisting of a robotic total station and a portable laptop-tablet with special software and an assembly module connected via a radio interface. During construction, precise geodetic measurements are done to control the spatial status of the cantilever facility and the constructed bridge segments. The correction data are being registered into the total station and then transmitted to the assembly module. This procedure is repeated until the completion of the bridge construction. The author emphasizes the importance of precise measurements and proposes the development of a system with high-precision geodetic tools and means of communication thus providing fast and reliable data preparation for spatial orientation and automated preparation of executive documentation.</p>

Authors

Institutions

Publication Details

Published
2025-09-09
DOI
https://doi.org/10.62683/sinarg2025.011
Citations
2
Primary Topic
Geodetic Measurements and Engineering Structures
Type
article
Field-Weighted Citation Impact
1.91
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

AUTOMATED SYSTEM FOR GEODETIC CONTROL IN BUILDING OF BRIDGE SUPERSCTRUCTURE CONSTRUCTION USING THE CANTILEVER CONCRETE OR ASSEMBLY METHOD

Ani Stefanova
2 citations
Geodetic Measurements and Engineering Structures
1.91
article

AUTOMATED SYSTEM FOR GEODETIC CONTROL IN BUILDING OF BRIDGE SUPERSCTRUCTURE CONSTRUCTION USING THE CANTILEVER CONCRETE OR ASSEMBLY METHOD

Ani Stefanova
article en
2 citations

Abstract

<p>The article presents an automated system for geodetic control in building of bridge superstructure constructions using the cantilever construction method. The system includes two modules: an observation module consisting of a robotic total station and a portable laptop-tablet with special software and an assembly module connected via a radio interface. During construction, precise geodetic measurements are done to control the spatial status of the cantilever facility and the constructed bridge segments. The correction data are being registered into the total station and then transmitted to the assembly module. This procedure is repeated until the completion of the bridge construction. The author emphasizes the importance of precise measurements and proposes the development of a system with high-precision geodetic tools and means of communication thus providing fast and reliable data preparation for spatial orientation and automated preparation of executive documentation.</p>

University of Architecture, Civil Engineering and Geodesy (BG)
Openalex Percentile: Top 13%
Geodetic Measurements and Engineering Structures
1.91
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.