A Peak Regulation Method for industrial Parks Considering Uncertainty Factors

As a high-energy-consuming user in the power system, industrial load requires a large amount of electricity for its operation and has great demand response potential. It can serve as an important resource for participating in peak regulation response in the new power system. Therefore, this paper studies a peak regulation method for industrial parks that takes into account uncertain factors. Firstly, according to the uncertainties of new energy power generation and the order quantity of industrial loads, a probability model is constructed to reflect these uncertain issues. Secondly, aiming at the optimal benefits of both the industrial park and the dispatching center, a Stackelberg game model between the power grid dispatching center and the industrial park is established. The upper-level leader is the dispatching center, and the lower-level follower is the industrial park. This model makes use of the differentiated characteristics among users to optimize the energy management strategy of the industrial park. Then, a green certificate trading market is incorporated into the game model, and the consumption rate of new energy is improved under the stimulation of green certificate trading. Finally, through the cooperation of the genetic algorithm and the Cplex solver for solution, it is verified that under the model proposed in this paper, it is feasible for industrial parks to participate in peak regulation response.

Authors

Institutions

Publication Details

Published
2025-08-03
DOI
https://doi.org/10.1109/iciea65512.2025.11148958
Primary Topic
Sustainable Industrial Ecology
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A Peak Regulation Method for industrial Parks Considering Uncertainty Factors

Li Tian, Xiaozhuo Guan, Zhenglong Sun, Bai Song et al.
Sustainable Industrial Ecology
article

A Peak Regulation Method for industrial Parks Considering Uncertainty Factors

Li Tian, Xiaozhuo Guan, Zhenglong Sun, Bai Song, Da Li, Shi Liu
article en

Abstract

As a high-energy-consuming user in the power system, industrial load requires a large amount of electricity for its operation and has great demand response potential. It can serve as an important resource for participating in peak regulation response in the new power system. Therefore, this paper studies a peak regulation method for industrial parks that takes into account uncertain factors. Firstly, according to the uncertainties of new energy power generation and the order quantity of industrial loads, a probability model is constructed to reflect these uncertain issues. Secondly, aiming at the optimal benefits of both the industrial park and the dispatching center, a Stackelberg game model between the power grid dispatching center and the industrial park is established. The upper-level leader is the dispatching center, and the lower-level follower is the industrial park. This model makes use of the differentiated characteristics among users to optimize the energy management strategy of the industrial park. Then, a green certificate trading market is incorporated into the game model, and the consumption rate of new energy is improved under the stimulation of green certificate trading. Finally, through the cooperation of the genetic algorithm and the Cplex solver for solution, it is verified that under the model proposed in this paper, it is feasible for industrial parks to participate in peak regulation response.

Northeast Electric Power University (CN), Jilin Electric Power Research Institute (China) (CN)
Openalex Percentile: Top 66%
Sustainable Industrial Ecology
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

A Peak Regulation Method for industrial Parks Considering Uncertainty Factors — Li Tian, Xiaozhuo Guan, et al. · (2025) | TGRS Research Map | TGRS