Risk Identification And Mitigation Of The Ulapan Electric Train Construction Project In Gianyar District

Efforts to improve tourism in the ULAPAN area (Ubud, Tegallalang, Payangan) are carried out by connecting ULAPAN with other areas in Bali through the ULAPAN Electric Train Development Project Planning. Various risks are possible in the implementation plan of the ULAPAN Electric Train Development Project. To minimize the impact and possibility of risks in the ULAPAN Electric Train Development Project, risk management is needed. This study uses a qualitative research method, namely by brainstorming and interviewing parties involved and competent in the Electric Train Development Project with a total of 28 respondents. The likelihood of risk (likelihood) and the influence that occurs due to risk (consequences) are obtained through the answers given by the respondents, then a risk assessment can be carried out by multiplying the frequency mode value/likelihood of risk (likelihood) by the consequence mode value/risk influence (consequences). The risk identification obtained was 32 risks, namely 9 unacceptable risks (28.13%), 15 undesirable risks (46.88%) and 8 acceptable risks (25%). Dominant risks are risks that fall into the unacceptable and undesired categories. Proper risk management requires the allocation of risk ownership to related parties. Mitigation carried out against the risk of errors in construction time estimation with the largest risk value is by carefully recalculating and paying attention to priority work so that time is more efficient.

Authors

Publication Details

Journal
International Journal of Progressive Sciences and Technologies
Published
2025-06-30
DOI
https://doi.org/10.52155/ijpsat.v51.1.7282
Primary Topic
Reliability and Maintenance Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Risk Identification And Mitigation Of The Ulapan Electric Train Construction Project In Gianyar District

I Gusti Agung Ayu Istri Lestari, Krisna Kurniari, I Gede Bagus Gita Pranata Putra, I Wayan Gede Darma Yoga
International Journal of Progressive Sciences and Technologies
Reliability and Maintenance Optimization
article

Risk Identification And Mitigation Of The Ulapan Electric Train Construction Project In Gianyar District

I Gusti Agung Ayu Istri Lestari, Krisna Kurniari, I Gede Bagus Gita Pranata Putra, I Wayan Gede Darma Yoga
article en

Abstract

Efforts to improve tourism in the ULAPAN area (Ubud, Tegallalang, Payangan) are carried out by connecting ULAPAN with other areas in Bali through the ULAPAN Electric Train Development Project Planning. Various risks are possible in the implementation plan of the ULAPAN Electric Train Development Project. To minimize the impact and possibility of risks in the ULAPAN Electric Train Development Project, risk management is needed. This study uses a qualitative research method, namely by brainstorming and interviewing parties involved and competent in the Electric Train Development Project with a total of 28 respondents. The likelihood of risk (likelihood) and the influence that occurs due to risk (consequences) are obtained through the answers given by the respondents, then a risk assessment can be carried out by multiplying the frequency mode value/likelihood of risk (likelihood) by the consequence mode value/risk influence (consequences). The risk identification obtained was 32 risks, namely 9 unacceptable risks (28.13%), 15 undesirable risks (46.88%) and 8 acceptable risks (25%). Dominant risks are risks that fall into the unacceptable and undesired categories. Proper risk management requires the allocation of risk ownership to related parties. Mitigation carried out against the risk of errors in construction time estimation with the largest risk value is by carefully recalculating and paying attention to priority work so that time is more efficient.

International Journal of Progressive Sciences and TechnologiesVol. 51(1)
Openalex Percentile: Top 70%
Reliability and Maintenance Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Risk Identification And Mitigation Of The Ulapan Electric Train Construction Project In Gianyar District — I Gusti Agung Ayu Istri Lestari, Krisna Kurniari, et al. · International Journal of Progressive Sciences and Technologies (2025) | TGRS Research Map | TGRS