Study on scaling mechanism and plugging removal technology of wellbore in Jingbian gas field

Abstract The scaling in tubing is a serious problem in Jingbian gas field, which leads to the increase of low production and low efficiency wells year by year. The production capacity of gas wells cannot be utilized effectively. In this paper, the scanning electron microscopy (SEM) was used to characterize the morphology of scale, and energy dispersion spectroscopy (EDS) and X-ray diffraction (XRD) were utilized to analyze the composition of scaling products. According to the design of the plugging removal scheme, the scale-dissolving test of acid plugging remover was carried out. The results show that the scale samples have a three-layer structure, and the morphology of the three layers is quite different, but the chemical composition of the three layers is CaCO3. After adding acid plugging removal agent, the scale-like reaction is severe, a lot of gas escape, 40 h completely dissolved, no solid residue. Based on the test results and the production situation of Jingbian gas field, the scaling mechanism of gas wells is clarified, and the plugging removal scheme is optimized, which provides a basis for increasing production and efficiency of Jingbian gas field.

Authors

Institutions

Publication Details

Journal
Journal of Physics Conference Series
Published
2025-09-01
DOI
https://doi.org/10.1088/1742-6596/3048/1/012177
Primary Topic
Hydraulic Fracturing and Reservoir Analysis
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Study on scaling mechanism and plugging removal technology of wellbore in Jingbian gas field

Xiangwen Dang, Yuntao Xi, Liping Liu, Yang Liu et al.
1 links
Journal of Physics Conference Series
Hydraulic Fracturing and Reservoir Analysis
article

Study on scaling mechanism and plugging removal technology of wellbore in Jingbian gas field

Xiangwen Dang, Yuntao Xi, Liping Liu, Yang Liu, Chen Hu
article en

Abstract

Abstract The scaling in tubing is a serious problem in Jingbian gas field, which leads to the increase of low production and low efficiency wells year by year. The production capacity of gas wells cannot be utilized effectively. In this paper, the scanning electron microscopy (SEM) was used to characterize the morphology of scale, and energy dispersion spectroscopy (EDS) and X-ray diffraction (XRD) were utilized to analyze the composition of scaling products. According to the design of the plugging removal scheme, the scale-dissolving test of acid plugging remover was carried out. The results show that the scale samples have a three-layer structure, and the morphology of the three layers is quite different, but the chemical composition of the three layers is CaCO3. After adding acid plugging removal agent, the scale-like reaction is severe, a lot of gas escape, 40 h completely dissolved, no solid residue. Based on the test results and the production situation of Jingbian gas field, the scaling mechanism of gas wells is clarified, and the plugging removal scheme is optimized, which provides a basis for increasing production and efficiency of Jingbian gas field.

Journal of Physics Conference SeriesVol. 3048(1)
Xi'an Shiyou University (CN), Daqing Oilfield General Hospital (CN)
Openalex Percentile: Top 75%
Hydraulic Fracturing and Reservoir Analysis
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.