Is “Design and Build” suitable for social housing projects in the UK housing crisis?

Purpose Design and build (DB) and traditional contracting (TC) are the two dominant procurement methods used in the UK. Despite widespread use, there is a lack of research into the benefits and limitations of DB when applied to social housing projects. This research investigates whether DB is more appropriate for social housing than TC in the current housing crisis and provides guidance upon its implementation. Design/methodology/approach Eight expert interviews and six multiple-case studies were conducted to collect empirical evidence to validate the hypotheses, with thematic analysis for analysing qualitative data. Findings DB is now the predominant procurement route for new-build social housing projects. Practitioners suggest DB suits new builds rather than complex refurbishment, which generate multiple variations and cost unpredictability. A more sophisticated form of DB, novated DB, allows for the implementation of two-stage tendering for project delivery which provides cost, time and quality certainty when compared with TC. Research limitations/implications This research is based upon empirical work conducted in the West Midlands. Further research should be undertaken nationwide so that results can represent the whole UK. Practical implications Novated DB implemented with two-stage tendering should be adopted for social housing production but not for complex refurbishment. Social implications Housing associations should review their current procurement policies to decide whether a form of novated DB should be adopted to expedite housing supply. Originality/value Novated DB implemented through a two-stage tendering is a preferred option to tackle the housing crisis due to its cost, time and quality certainty in new builds.

Authors

Institutions

Publication Details

Journal
Built Environment Project and Asset Management
Published
2025-04-01
DOI
https://doi.org/10.1108/bepam-04-2024-0113
Primary Topic
Housing, Finance, and Neoliberalism
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Is “Design and Build” suitable for social housing projects in the UK housing crisis?

Keith Gale, Terence Y.M. Lam, Tom Brock
1 links
Built Environment Project and Asset Management
Housing, Finance, and Neoliberalism
article

Is “Design and Build” suitable for social housing projects in the UK housing crisis?

Keith Gale, Terence Y.M. Lam, Tom Brock
article en

Abstract

Purpose Design and build (DB) and traditional contracting (TC) are the two dominant procurement methods used in the UK. Despite widespread use, there is a lack of research into the benefits and limitations of DB when applied to social housing projects. This research investigates whether DB is more appropriate for social housing than TC in the current housing crisis and provides guidance upon its implementation. Design/methodology/approach Eight expert interviews and six multiple-case studies were conducted to collect empirical evidence to validate the hypotheses, with thematic analysis for analysing qualitative data. Findings DB is now the predominant procurement route for new-build social housing projects. Practitioners suggest DB suits new builds rather than complex refurbishment, which generate multiple variations and cost unpredictability. A more sophisticated form of DB, novated DB, allows for the implementation of two-stage tendering for project delivery which provides cost, time and quality certainty when compared with TC. Research limitations/implications This research is based upon empirical work conducted in the West Midlands. Further research should be undertaken nationwide so that results can represent the whole UK. Practical implications Novated DB implemented with two-stage tendering should be adopted for social housing production but not for complex refurbishment. Social implications Housing associations should review their current procurement policies to decide whether a form of novated DB should be adopted to expedite housing supply. Originality/value Novated DB implemented through a two-stage tendering is a preferred option to tackle the housing crisis due to its cost, time and quality certainty in new builds.

Built Environment Project and Asset ManagementVol. 15(4)
Hampshire County Council (GB), Northumbria University (GB), Sustainable Home Survey (United Kingdom) (GB)
Openalex Percentile: Top 68%
Housing, Finance, and Neoliberalism
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Is “Design and Build” suitable for social housing projects in the UK housing crisis? — Keith Gale, Terence Y.M. Lam, et al. · Built Environment Project and Asset Management (2025) | TGRS Research Map | TGRS