Dynamic Operation of Battery Storage Systems for Residual Load Smoothing
Maintaining grid balance represents a significant challenge in light of the growing proportion of renewable energy sources in power generation. A viable solution to enhance grid balance is the implementation of Battery Energy Storage Systems (BESS), which can be charged during low-demand periods and discharged during peak load times. This paper investigates the feasibility of deploying a BESS within a district comprising a population of 100,000. The proposed optimization algorithm is formulated as a mixed-integer linear programming problem. While this algorithm applies a linear battery model, the results are compared to those obtained from a second-order equivalent circuit model. The findings indicate that the dynamic operation of the BESS can effectively reduce the standard deviation of the residual load by as much as 3.5 MWh.
Authors
- Lingga Aksara Putra (ORCID: https://orcid.org/0000-0001-6321-9139)
- J. Kainz (ORCID: https://orcid.org/0000-0003-2493-3588)
- Matthias Gaderer (ORCID: https://orcid.org/0000-0002-7954-2333)
- Jinghua Sun (ORCID: https://orcid.org/0000-0002-3753-8045)
Institutions
- Weihenstephan-Triesdorf University of Applied Sciences (DE)
- Stadtwerke Straubing (Germany) (DE)
Publication Details
- Published
- 2025-08-25
- DOI
- https://doi.org/10.1109/ccta53793.2025.11151534
- Primary Topic
- Advanced Battery Technologies Research
- Type
- article
- Field-Weighted Citation Impact
- 0.00