Wind Power Forecast Error-Driven Day-Ahead Scheduling Method for Power Systems with Flexibility Chance Constraints

In recent years, renewable energy sources (RESs) have been increasingly integrated into power systems to address energy crises and environmental concerns. However, the inherent uncertainty and volatility of RESs pose significant challenges to the secure and cost-effective operation of power systems, such as increased risk of curtailment and supply shortages. Enhancing power system flexibility is an effective way to address these challenges. However, existing studies on flexibility primarily focus on its evaluation, while limited research has considered incorporating flexibility directly into scheduling models. To address this issue, this paper proposes a day-ahead scheduling model with flexibility chance constraints (DASFCC), driven by wind power forecast errors. First, historical wind power data are used to model the forecast error and derive a probability density function characterizing the flexibility demand. Next, the flexible supply capabilities of coal-fired units are analyzed. Then, the DASFCC model is formulated and reformulated as a mixedinteger linear programming problem. Finally, numerical results demonstrate the validity of the DASFCC model in improving the accommodation of wind power and reducing operational costs.

Authors

Institutions

Publication Details

Published
2025-08-20
DOI
https://doi.org/10.1109/psgec66102.2025.11151060
Primary Topic
Electric Power System Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Wind Power Forecast Error-Driven Day-Ahead Scheduling Method for Power Systems with Flexibility Chance Constraints

Mengjie Teng, Yuhong Zhao, Jingxuan Zhu, Chen Chen
Electric Power System Optimization
article

Wind Power Forecast Error-Driven Day-Ahead Scheduling Method for Power Systems with Flexibility Chance Constraints

Mengjie Teng, Yuhong Zhao, Jingxuan Zhu, Chen Chen
article en

Abstract

In recent years, renewable energy sources (RESs) have been increasingly integrated into power systems to address energy crises and environmental concerns. However, the inherent uncertainty and volatility of RESs pose significant challenges to the secure and cost-effective operation of power systems, such as increased risk of curtailment and supply shortages. Enhancing power system flexibility is an effective way to address these challenges. However, existing studies on flexibility primarily focus on its evaluation, while limited research has considered incorporating flexibility directly into scheduling models. To address this issue, this paper proposes a day-ahead scheduling model with flexibility chance constraints (DASFCC), driven by wind power forecast errors. First, historical wind power data are used to model the forecast error and derive a probability density function characterizing the flexibility demand. Next, the flexible supply capabilities of coal-fired units are analyzed. Then, the DASFCC model is formulated and reformulated as a mixedinteger linear programming problem. Finally, numerical results demonstrate the validity of the DASFCC model in improving the accommodation of wind power and reducing operational costs.

Xi'an Jiaotong University (CN)
Openalex Percentile: Top 77%
Electric Power System Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Wind Power Forecast Error-Driven Day-Ahead Scheduling Method for Power Systems with Flexibility Chance Constraints — Mengjie Teng, Yuhong Zhao, et al. · (2025) | TGRS Research Map | TGRS