Deploying small modular reactors in newcomer countries: Adapting the IAEA milestones approach and the way forward

Small Modular Reactors (SMRs) are expected to be instrumental in achieving global nuclear expansion targets by 2050 and advancing energy transition objectives. Their compact size, lower power output, flexible financing models, accelerated construction timelines, and diverse applications make them attractive options for rapidly developing SMRs. However, the successful deployment of SMRs necessitates a tailored adaptation of the International Atomic Energy Agency's (IAEA) well-established Milestones Approach, originally designed for large nuclear power plants (LNPPs). The IAEA Milestones Approach, comprising three phases and three milestones focused on the 19 infrastructure development issues, provides a structured framework for LNPP deployment over a typical 10–15 years period, reflecting the scale, complexity, and financial magnitude of such mega projects. This study evaluates the applicability of that framework to SMRs' specific needs and proposes necessary adjustments to reflect their unique characteristics. Using a combination of mastering and similarity approaches, comparative adaptation and scaling techniques, current SMR licensing and construction records, case studies, and expert judgments, this research recommends a construction timeline of 7–10 years for first-of-a-kind (FOAK) SMRs in newcomer countries. However, it would take shorter timeline for advanced nuclear nations. For Nth-of-a-Kind (NOAK) reactors, deployment may take up to five years in both newcomer and advanced nuclear countries. The estimated timeframe and associated narratives of the 19 infrastructure development issues for SMRs deployment can provide as a basis for effective planning and conceptualization, and can be customized to align with the unique requirements of each country. The paper also depicts the current status and deployment challenges faced by SMR-implementing countries, offering practical insights and policy considerations to facilitate a faster and more effective global rollout of SMR technologies.

Authors

Publication Details

Journal
Energy Strategy Reviews
Published
2025-09-01
DOI
https://doi.org/10.1016/j.esr.2025.101841
Citations
1
Primary Topic
Graphite, nuclear technology, radiation studies
Type
article
Field-Weighted Citation Impact
0.52
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Deploying small modular reactors in newcomer countries: Adapting the IAEA milestones approach and the way forward

Md. Shafiqul Islam, Zareen Tahsin Anjum
1 citations
Energy Strategy Reviews
Graphite, nuclear technology, radiation studies
0.52
article

Deploying small modular reactors in newcomer countries: Adapting the IAEA milestones approach and the way forward

Md. Shafiqul Islam, Zareen Tahsin Anjum
article en
1 citations

Abstract

Small Modular Reactors (SMRs) are expected to be instrumental in achieving global nuclear expansion targets by 2050 and advancing energy transition objectives. Their compact size, lower power output, flexible financing models, accelerated construction timelines, and diverse applications make them attractive options for rapidly developing SMRs. However, the successful deployment of SMRs necessitates a tailored adaptation of the International Atomic Energy Agency's (IAEA) well-established Milestones Approach, originally designed for large nuclear power plants (LNPPs). The IAEA Milestones Approach, comprising three phases and three milestones focused on the 19 infrastructure development issues, provides a structured framework for LNPP deployment over a typical 10–15 years period, reflecting the scale, complexity, and financial magnitude of such mega projects. This study evaluates the applicability of that framework to SMRs' specific needs and proposes necessary adjustments to reflect their unique characteristics. Using a combination of mastering and similarity approaches, comparative adaptation and scaling techniques, current SMR licensing and construction records, case studies, and expert judgments, this research recommends a construction timeline of 7–10 years for first-of-a-kind (FOAK) SMRs in newcomer countries. However, it would take shorter timeline for advanced nuclear nations. For Nth-of-a-Kind (NOAK) reactors, deployment may take up to five years in both newcomer and advanced nuclear countries. The estimated timeframe and associated narratives of the 19 infrastructure development issues for SMRs deployment can provide as a basis for effective planning and conceptualization, and can be customized to align with the unique requirements of each country. The paper also depicts the current status and deployment challenges faced by SMR-implementing countries, offering practical insights and policy considerations to facilitate a faster and more effective global rollout of SMR technologies.

Energy Strategy ReviewsVol. 61
Openalex Percentile: Top 33%
Graphite, nuclear technology, radiation studies
0.52
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Deploying small modular reactors in newcomer countries: Adapting the IAEA milestones approach and the way forward — Md. Shafiqul Islam, Zareen Tahsin Anjum · Energy Strategy Reviews (2025) | TGRS Research Map | TGRS