Effect of Human and Materials Related Factors on Successful Performance of Road Construction Projects in IMO State

This study analysed the challenges bedeviling the application of Last Planner System in Construction Project Delivery in Imo State. The study was guided by Project Management Theories. A descriptive and survey research design methods of investigation and a purposes sampling technique was used to select a sample size of 193 from a population of 374 respondents using the Slovin’s formula for sample size determination from the sampled professionals in Imo state. The data collection and survey instrument included a well-structured questionnaire from respondents. The data collected was presented using frequency distribution, figures, and charts with aid of statistical tools via IBM SPSS Statistics version 26.0. While frequency distribution charts and Factor Analysis (FA) were used to analyse the main objectives of the study. The study's results show that out of the eighteen (18) main challenges of LPS implementation tested for factor analysis, the findings revealed seven (7) clusters named in other of significance. The study concludes that the most challenges bedeviling the application of LPS in construction project delivery in Imo State includes in this order; lack of guideline/standard practice, resistance to change, leadership and management commitment, attitude, commitment and partial implementation, lack of time for activities and learning and lack of training. This study recommends that concerted effort should be made at ensuring that some of the LPS implementation processes are deployed in facilitating the successful delivery of construction projects to fruition. The use daily huddle meeting is strongly advocated for as studied have shown holding meetings prior, during and after the construction project delivery processes have contributed the success in all ramifications.

Publication Details

Journal
International Journal of Emerging Trends in Engineering Research
Published
2025-09-09
DOI
https://doi.org/10.30534/ijeter/2025/021392025
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Effect of Human and Materials Related Factors on Successful Performance of Road Construction Projects in IMO State

International Journal of Emerging Trends in Engineering Research
Construction Project Management and Performance
article

Effect of Human and Materials Related Factors on Successful Performance of Road Construction Projects in IMO State

article en

Abstract

This study analysed the challenges bedeviling the application of Last Planner System in Construction Project Delivery in Imo State. The study was guided by Project Management Theories. A descriptive and survey research design methods of investigation and a purposes sampling technique was used to select a sample size of 193 from a population of 374 respondents using the Slovin’s formula for sample size determination from the sampled professionals in Imo state. The data collection and survey instrument included a well-structured questionnaire from respondents. The data collected was presented using frequency distribution, figures, and charts with aid of statistical tools via IBM SPSS Statistics version 26.0. While frequency distribution charts and Factor Analysis (FA) were used to analyse the main objectives of the study. The study's results show that out of the eighteen (18) main challenges of LPS implementation tested for factor analysis, the findings revealed seven (7) clusters named in other of significance. The study concludes that the most challenges bedeviling the application of LPS in construction project delivery in Imo State includes in this order; lack of guideline/standard practice, resistance to change, leadership and management commitment, attitude, commitment and partial implementation, lack of time for activities and learning and lack of training. This study recommends that concerted effort should be made at ensuring that some of the LPS implementation processes are deployed in facilitating the successful delivery of construction projects to fruition. The use daily huddle meeting is strongly advocated for as studied have shown holding meetings prior, during and after the construction project delivery processes have contributed the success in all ramifications.

International Journal of Emerging Trends in Engineering ResearchVol. 13(9)
Openalex Percentile: Top 72%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.