Evaluation of the Application of Last Planner System in Construction Projects

This study aimed at evaluating the application of LPS in construction projects. The study specifically sought to evaluate the current state of LPS application in construction project delivery and ascertain the extent of LPS implementation processes application in construction project delivery in Imo state, Nigeria. The study was guided by the Management-as-Planning and Management-as-Organizing Theory. The study used a descriptive and survey research design methods of investigation and a purposes sampling technique was used to select a sample size of 193 from a population of 374 respondents using the Slovin’s formula for sample size determination from the sampled professionals in Imo state. The data collection and survey instrument included a well-structured questionnaire from respondents. The data collected was presented using frequency distribution, figures, and charts with aid of statistical tools via IBM SPSS Statistics version 26.0. While frequency distribution charts, Relative Importance Index (RII) was used to analyse the main objectives of the study. The study's results show that the current state of LPS application in construction project delivery in Imo State is abysmally low. This was buttressed by the fact that (164) 93.18% of the respondents had a working experience of less than 5 years of experience on LPS, while 29.55% of the respondent are aware of the existence of LPS between 6 to 10 years ago. On the projects undertaken using LPS, 164 of the respondents representing 93.18% have had a working experience of 5-10 years. The concludes that the most important LPS implementation processes application in construction project delivery in Imo state is, daily huddle meetings, which is followed by constraints analysis, master schedule, process of phase planning and weekly work plan. This study recommends that the concludes the need for industry players, practitioners and government agencies at all levels to brace up to the paradigm change and embrace the “LPS”. Fora such as conferences and professional associations meetings should be a breeding ground to help propagate the idea.

Publication Details

Journal
International Journal of Emerging Trends in Engineering Research
Published
2025-09-09
DOI
https://doi.org/10.30534/ijeter/2025/041392025
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Evaluation of the Application of Last Planner System in Construction Projects

International Journal of Emerging Trends in Engineering Research
BIM and Construction Integration
article

Evaluation of the Application of Last Planner System in Construction Projects

article en

Abstract

This study aimed at evaluating the application of LPS in construction projects. The study specifically sought to evaluate the current state of LPS application in construction project delivery and ascertain the extent of LPS implementation processes application in construction project delivery in Imo state, Nigeria. The study was guided by the Management-as-Planning and Management-as-Organizing Theory. The study used a descriptive and survey research design methods of investigation and a purposes sampling technique was used to select a sample size of 193 from a population of 374 respondents using the Slovin’s formula for sample size determination from the sampled professionals in Imo state. The data collection and survey instrument included a well-structured questionnaire from respondents. The data collected was presented using frequency distribution, figures, and charts with aid of statistical tools via IBM SPSS Statistics version 26.0. While frequency distribution charts, Relative Importance Index (RII) was used to analyse the main objectives of the study. The study's results show that the current state of LPS application in construction project delivery in Imo State is abysmally low. This was buttressed by the fact that (164) 93.18% of the respondents had a working experience of less than 5 years of experience on LPS, while 29.55% of the respondent are aware of the existence of LPS between 6 to 10 years ago. On the projects undertaken using LPS, 164 of the respondents representing 93.18% have had a working experience of 5-10 years. The concludes that the most important LPS implementation processes application in construction project delivery in Imo state is, daily huddle meetings, which is followed by constraints analysis, master schedule, process of phase planning and weekly work plan. This study recommends that the concludes the need for industry players, practitioners and government agencies at all levels to brace up to the paradigm change and embrace the “LPS”. Fora such as conferences and professional associations meetings should be a breeding ground to help propagate the idea.

International Journal of Emerging Trends in Engineering ResearchVol. 13(9)
Openalex Percentile: Top 74%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Evaluation of the Application of Last Planner System in Construction Projects · International Journal of Emerging Trends in Engineering Research (2025) | TGRS Research Map | TGRS