Perencanaan Sistem PLTS Off-Grid Untuk Kebutuhan Energi Listrik Pada Perkebunan Kelapa Sawit

Palm oil plantations are one of the important sectors in the growth of the economy in Indonesia. One of the palm oil plantation areas in the Pasaman Barat Regency is being developed with an estimated land area of 100 hectares. However, due to the location of the land being far from settlements, there is currently no electricity supply that can be used for the operational needs of the land. This research provides a solution for the planning of an Off-Grid solar power plant (PLTS). The method used is a descriptive method with a quantitative research type. Based on the calculations, the number of PV panels obtained was 14 units and produces a total power of 2.397,89 W, SCC capacity calculation obtained 35 A, Battery capacity 12V/100Ah 2 units, and inverter 3 kW to produce AC voltage. The calculation of the Bill of Quantities (BoQ) for material needs amounts to Rp. 21.986.000. This result indicates that the planning of the solar power system is feasible for the long-term operational needs of the plantation, which only requires initial construction capital.

Authors

Institutions

Publication Details

Journal
Jurnal Inovasi Teknologi Terapan
Published
2025-08-29
DOI
https://doi.org/10.33504/jitt.v3i2.346
Primary Topic
Oil Palm Production and Sustainability
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Perencanaan Sistem PLTS Off-Grid Untuk Kebutuhan Energi Listrik Pada Perkebunan Kelapa Sawit

Ade Putra Maulana, Sirlus Andreanto Jasman Duli, Enggar Hero Istoto, Peprizal Peprizal et al.
Jurnal Inovasi Teknologi Terapan
Oil Palm Production and Sustainability
article

Perencanaan Sistem PLTS Off-Grid Untuk Kebutuhan Energi Listrik Pada Perkebunan Kelapa Sawit

Ade Putra Maulana, Sirlus Andreanto Jasman Duli, Enggar Hero Istoto, Peprizal Peprizal, Evvin Faristasari
article en

Abstract

Palm oil plantations are one of the important sectors in the growth of the economy in Indonesia. One of the palm oil plantation areas in the Pasaman Barat Regency is being developed with an estimated land area of 100 hectares. However, due to the location of the land being far from settlements, there is currently no electricity supply that can be used for the operational needs of the land. This research provides a solution for the planning of an Off-Grid solar power plant (PLTS). The method used is a descriptive method with a quantitative research type. Based on the calculations, the number of PV panels obtained was 14 units and produces a total power of 2.397,89 W, SCC capacity calculation obtained 35 A, Battery capacity 12V/100Ah 2 units, and inverter 3 kW to produce AC voltage. The calculation of the Bill of Quantities (BoQ) for material needs amounts to Rp. 21.986.000. This result indicates that the planning of the solar power system is feasible for the long-term operational needs of the plantation, which only requires initial construction capital.

Jurnal Inovasi Teknologi TerapanVol. 3(2)
University of Bangka Belitung (ID)
Openalex Percentile: Top 77%
Oil Palm Production and Sustainability
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.