Research on the Equipment Demand Forecast Model of Electrical Engineering Based on the Weak Information of Power Grid Construction Projects

The unified management of the procurement demand is an important part of the company's intelligent material supply chain management, including the equipment selection. Due to the lack of information in the early stage of the project, further research is needed on how to transform the weak information in the early stage of the project into strong information that can guide the material planning and purchase list. This paper aims to predict the equipment selection under weak information of power grid construction project by selecting core equipment based on ABC inventory method, constructing projects-equipment multidimensional heterogeneous interactive network and building the prediction model with Graph Attention Networks (GATs). The cases showed that the research can be used to support the material department of the company to carry out equipment demand forecasting and and scientifically select procurement strategies for electrical engineering.

Authors

Institutions

Publication Details

Published
2025-04-28
DOI
https://doi.org/10.1109/icaidt66272.2025.00086
Primary Topic
Evaluation and Optimization Models
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Research on the Equipment Demand Forecast Model of Electrical Engineering Based on the Weak Information of Power Grid Construction Projects

Honglue Qu, Tianqiong Chen, Weiwei Li, Shuo Wang et al.
Evaluation and Optimization Models
article

Research on the Equipment Demand Forecast Model of Electrical Engineering Based on the Weak Information of Power Grid Construction Projects

Honglue Qu, Tianqiong Chen, Weiwei Li, Shuo Wang, Bing Zhang
article en

Abstract

The unified management of the procurement demand is an important part of the company's intelligent material supply chain management, including the equipment selection. Due to the lack of information in the early stage of the project, further research is needed on how to transform the weak information in the early stage of the project into strong information that can guide the material planning and purchase list. This paper aims to predict the equipment selection under weak information of power grid construction project by selecting core equipment based on ABC inventory method, constructing projects-equipment multidimensional heterogeneous interactive network and building the prediction model with Graph Attention Networks (GATs). The cases showed that the research can be used to support the material department of the company to carry out equipment demand forecasting and and scientifically select procurement strategies for electrical engineering.

State Grid Corporation of China (China) (CN), Economic Research Institute (BG), Economic Research Institute (KZ)
Openalex Percentile: Top 71%
Evaluation and Optimization Models
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Research on the Equipment Demand Forecast Model of Electrical Engineering Based on the Weak Information of Power Grid Construction Projects — Honglue Qu, Tianqiong Chen, et al. · (2025) | TGRS Research Map | TGRS