A8 Blending In-situ Simulations with Safety-II Theory: The Identification of Risk and System Improvement Opportunities Before Moving into a New Emergency Department.
Introduction: As demand for emergency care escalates, Emergency Departments (EDs) seek to create capacity by commissioning temporary clinical spaces, such as mobile units attached to infrastructure, or via entire new-build departments. Expanding and modernising the areas in which treatment is delivered aims to improve the quality of care by increasing capacity within the system; however, moving to new spaces presents challenges and opportunities [1]. In-situ simulation (ISS) has been used in the literature to test new builds [2], but often with a theoretical basis that safety threats can be found and fixed without a full exploration of everyday clinical work, and often lacking a longitudinal view of risks or opportunities that emerge after moving into the new environment. Modern EDs are appreciated as socio-technical systems, where work is completed by teams using specialised tools and equipment, and staff constantly adapt how they work to meet inherently variable demands. Safety II (SFII) is an approach to understanding complexity in healthcare systems that has developed into a coherent set of guiding principles, but it requires further application in emergency care [3]. Methods: Ethical approval was not required for this work as it was a service evaluation. A multidisciplinary team developed a mix of clinical and non-clinical multimodal simulations (n=30) delivered in the newly built ED two weeks before move-in. Seventy-seven staff members from multiple cross-boundary professional groups participated in the project. ISS were designed to identify latent safety threats (LSTs), illuminate practice variability in Everyday Clinical Work (ECW), and understand how staff adapt to manage demands, informing better system learning. After move-in, the team facilitated longitudinal feedback by organising focus groups to understand how staff had adapted to the new environment. Results: Forty-four LSTs were identified for action or mitigation, Table 1-A8. The Simulation Coordination Team (SCT) also redesigned several patient pathways by learning from descriptions of everyday clinical work and then streamlining processes. After moving into the new build, the 4-hour Emergency Access Standard improved by 4.41%, the average time a patient was seen within 60 minutes by a senior decision maker improved by 2.67%, and the average ambulance handover achieved within 30 minutes improved by 6.33%. Discussion: The SCT found that combining ISS with SFII theory promoted a better understanding of ECW, adaptations, and threats to the system before moving to the new build. Engaging multiple stakeholders, from executives to external teams, created learning opportunities and shaped better responses to demands. Ethics statement: Authors confirm that all relevant ethical standards for research conduct and dissemination have been met. The submitting author confirms that relevant ethical approval was granted, if applicable. References 1. Patterson MG. In situ simulation: detection of safety threats and teamwork training in a high-risk emergency department. BMJ Qual Safety. 2013;125–133. 2. Francouer CS. It takes a villages to move hospital: simulation improves intensive care preparedness for a move to a new site. Hosp Paediatrics. 2018. 3. Anderson JR. Beyond ‘find and fix’: improving quality and safety through resilient healthcare systems. International Journal of Quality in Health Care. 2020;204-211. Table 1-A8.Description of simulation, Testing, LST(s), and Mitigation/Action Sim Ref Simulation Testing(Process/ Pathway) LST(s) Identified/ Categories Mitigation/ Action 1 Patient Journey:Chest Pain • Logical flow through ED to:○ Assessment area○ Ward○ Discharge• Streaming routes• Pre-assessment cubicle suitability 1. The reclining chairs in the pre-assessment/ECG rooms are not fit-for-purpose so can these be static examination couches? Can we consider the same for Triage? (En) 1. Appropriate examples sent to project management - purchased and in situ before new build move 2 Collapse at triage:Cardiac Arrest • To assess in triage room and move to resus/cubicle• Space and availability of equipment 2. Why are there two emergency buzzers? (En/T)3. Will Vocera work throughout the build? (En)4. Where are the emergency buzzer panels? (En/T)5. Where are the otoscopes/ ophthalmoscopes going? (En) 2. Build/project team state it is new regulations3. Additional access points for WIFI are now installed and all “black spots” identified and resolved before move4. Shown to sim team, panels still required programming – completed before move5. Discussed with clinical team. Fitted in every cubicle on a side wall at the head-end of the wall 3 Transfer to CT of critically unwell patient:Elderly Abdo Pain • Logistics of space• Availability of equipment and routes. 6. Do we get priority for the pod system if others are queued? (En)7. Where is the alert phone going? Will there be a ringer in resus? (En) 6. Pod system has not changed. Project team advised no impact on ED.7. Will be positioned at the Nurse in Charge (NIC)/ Emergency Physician In Charge/ Progress Chaser Desk. No ringer in resus. 4 Transfer to theatre of trauma patient. • Communication with theatres• Distance from New ED 8. Pathway development conversation (T/P)9. Do we have any new syringe drivers? (Eq)10. Is there telemetry in resus (as you cannot see the patient in Bay 1 from sat at the nurses desk for example)? If so, does it alarm at the desk or just in the bay? (Eq) 8. Direct to theatre pathway.9. Medical library to implement a process for medical devices ED have a total of 24 pumps. ED now have syringe driver and infusion pump charging stacks in ED for majors and resus.10. Yes, central monitoring in resus and at NIC staff base and alarms at all telemetry stations. 5 Collapse on way to Ambulatory Care • Time for response to emergency buzzer from different areas• Space and logistics 11. Are we finalised on labelling above doors of areas? (See and Treat for example is not labelled from the Major’s side which has caused confusion when moving patients during a number of sims) (En) 11. Signage is yet to be complete - once installation has been finished we can complete a walk through - FBC installed - further additions now on order - awaiting install date from TDC 6 Prepare for transfer to a different hospital • Admin logistics (printing/ photocopying)• Logistics of ambulance attendance 12. The doors are very heavy - assuming this is just because they will be automatic? (En) 12. They are automatic – not turned on for a number of sims as work still ongoing. 7 Major Haemorrhage:Trauma • Maj Haemorrhage protocol• Distance from blood bank• Time for blood to get to New ED 13. Can we have clocks and whiteboards in every resus bay? (En/Eq/P) 13. Clocks and whiteboards ordered and fitted before move. 8 Major Trauma:Adult • Ambulance pt to resus from ambulance bay• Familiarisation of trauma team with New ED• Trauma network awareness• Location of equipment in New ED 14. Screens needed for resus (in case we need to split cubicles for major incidents etc.) (En/Eq) 14. Additional screens made available to ED before move. 9 Major Trauma:Paediatric • Ambulance patient via ambulance door to resus compared to moving them to Paeds ED• Availability of equipment (major trauma kit)• Introducing trauma team to new resus.• Knowledge of how to manage paeds trauma patient and trauma network• Step-up vs. step-down Paeds ED and Resus 15. Can we have a joint adult and paediatric airway trolley in all resus bays? (Eq) 15. They are not big enough for both sets of equipment, so will remain separate. 10 Cardiology:ST Elevation Myocardial Infarction • Walk in process of how chest pain managed via triage• Assessment of pt in space available• Availability of equipment (ECG machines etc.)• Bring through for ECG in pre-assessment rooms behind triage• Transfer to majors vs. resus.• Where to get drugs from in majors and resus 16. Are there drugs in triage? (Eq)17. Is there canulation kit in triage, or just in the post-triage intervention/ECG rooms? (Eq) 16. Paediatric triage has drug cupboards, we can move the current drug cupboard from triage in the retained estate into one of the triage rooms. New cabinets now ordered - awaiting install date17. Stock was to be defined by clinical teams. There is cannulation equipment in triage. 11 Aortic Dissection • Moving from corridor to resus• Arterial line equipment• New monitor set-up• Use of syringe drivers in new space• Transfer bag suitability 18. Can we have emergency buzzers in the long corridor? (En/P) 18. Yes - awaiting install date. 12 Cardiology:Bradycardia • Level 2/3 care in the space we have• Medical management of bradycardia including pacing and drugs 19. New telemetry monitors will need testing (Eq/En) 19. Tested and functional 13 ED Operations and Escalation:Trust-wide Tabletop • Triage Delay• Bed Wait• Staffing Crisis (Nursing and Medical)• Ambulance Offload Delay• Internal Critical vs. Major Incident• Full Resus• Multiple Cardiac Arrests• IT Service Failure• Phone/ Bleep Failure• POD Failure• Mass Strike Action (e.g. 72-hour walk-out)• Delays with non-admitted patients/ peaks in activity 20. ED Operations and Escalation Plan update needed (P) 20. Update dynamic and being reviewed 14 COPD:Type 2 Respiratory Failure • Access to equipment in resus• Level 2/3 care• Use of NIV in new resus• IT and communication infrastructure 21. Why is there medical ai
Authors
- Peter Chessum (ORCID: https://orcid.org/0000-0002-2701-1901)
- Benjamin McWalter
- Natalie Sandford
Publication Details
- Journal
- Journal of Healthcare Simulation
- Published
- 2024-11-04
- DOI
- https://doi.org/10.54531/qijo1570
- Primary Topic
- Interprofessional Education and Collaboration
- Type
- article
- Field-Weighted Citation Impact
- 0.00