The CIREG Guide to Managing Flood Risk during Construction – an overview, from risk assessment to practical response and mitigation recommendations

Abstract Flooding is a major cause of physical loss or damage during civil engineering and infrastructure construction, and a key risk for tunnels and underground works. Damage to partially or fully completed projects can lead to high reinstatement and cleanup costs, delays, budget overruns, lost revenue, penalties, and DSU insurance expenses. These impacts affect all stakeholders — clients, designers, consultants, contractors, insurers, and third parties. Where flood risk exists, exposures must be identified, responsibilities defined in contracts, and mitigation measures costed into project delivery. Climate change is making weather patterns more unpredictable, with heavy rain and floods causing significant damage and delays. It also undermines the reliability of historical hydrological data. This guide, compiled by the Construction Insurance Risk Engineers Group (CIREG), focuses on flood risk during construction, shares lessons learned, and provides a reference protocol for risk management. It aims to raise awareness, prompt action, and support the creation of Flood Risk Management Plans, Baseline Reports, and Hazard Maps.

Authors

Institutions

Publication Details

Journal
ce/papers
Published
2025-09-01
DOI
https://doi.org/10.1002/cepa.3345
Primary Topic
Flood Risk Assessment and Management
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

The CIREG Guide to Managing Flood Risk during Construction – an overview, from risk assessment to practical response and mitigation recommendations

John Robson, Mark Allan, Panagiotis Spyridis, Alan L. Patrick et al.
ce/papers
Flood Risk Assessment and Management
article

The CIREG Guide to Managing Flood Risk during Construction – an overview, from risk assessment to practical response and mitigation recommendations

John Robson, Mark Allan, Panagiotis Spyridis, Alan L. Patrick, A. I. Adeyemo, Spyridon Konstantis, Trevor Chainey, Kevin Province
article en

Abstract

Abstract Flooding is a major cause of physical loss or damage during civil engineering and infrastructure construction, and a key risk for tunnels and underground works. Damage to partially or fully completed projects can lead to high reinstatement and cleanup costs, delays, budget overruns, lost revenue, penalties, and DSU insurance expenses. These impacts affect all stakeholders — clients, designers, consultants, contractors, insurers, and third parties. Where flood risk exists, exposures must be identified, responsibilities defined in contracts, and mitigation measures costed into project delivery. Climate change is making weather patterns more unpredictable, with heavy rain and floods causing significant damage and delays. It also undermines the reliability of historical hydrological data. This guide, compiled by the Construction Insurance Risk Engineers Group (CIREG), focuses on flood risk during construction, shares lessons learned, and provides a reference protocol for risk management. It aims to raise awareness, prompt action, and support the creation of Flood Risk Management Plans, Baseline Reports, and Hazard Maps.

ce/papersVol. 8(3-4)
Center for Global Development (US), General Medical Council (GB), Risk Management Solutions (United Kingdom) (GB), UK Green Building Council (GB), BMI The London Independent Hospital (GB), Royal London Group (United Kingdom) (GB), AIR Worldwide (United Kingdom) (GB), Independent Age (GB), Oldham Council (GB), 21c Consultancy (United Kingdom) (GB), University of Rostock (DE)
Openalex Percentile: Top 78%
Flood Risk Assessment and Management
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.